My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-09_REVISION - M1979191
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-06-09_REVISION - M1979191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:14 PM
Creation date
6/10/2014 12:14:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
Revision
Doc Date
6/9/2014
Doc Name
Amendment Application
From
Martin Marietta Materials, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There has been no refuse, acid-forming, or toxic producing material mined at Three Bells; no <br /> production of these materials is anticipated during the remainder of the mining process. <br /> Drill holes and auger holes will be filled with non-combustible materials, as outlined in Rule <br /> 3.1.5(6). Three Bells Mine is a surface gravel pit and quarry. The mine has no adits or shafts <br /> that require closing. <br /> Reclamation is not anticipated to include plans for agricultural or horticultural use. <br /> MMM does not plan to use offsite structural fill as backfill material. <br /> All mined material to be disposed of onsite will be disposed in manner to prevent <br /> contamination of the drainage system. <br /> No pollutants will be released to groundwater during reclamation. Any incidental chemical or <br /> fuel spills will be contained and remediated in an expedient and appropriate manner. <br /> 5.5.4 Water— General Requirements <br /> Disturbances to surface water and groundwater will meet all Colorado water laws and <br /> regulations. Necessary permits will be obtained for wells and disturbances. All Colorado and <br /> federal water quality regulations will be met both on the statewide level, and on a site- <br /> specific standard basis. Any variation will be reclaimed to mitigate water contamination. <br /> No siltation structures on the Three Bells Mine lie in drainways. <br /> Earth dams will be constructed to impound reservoirs for the reclamation plan. The below <br /> grade reservoirs develop on the Three Bells Mine will have earth embankments constructed <br /> in stable configuration according to SEO requirements. Reservoir embankments will comply <br /> with water pollution laws and will be constructed with inert, low permeability materials to <br /> prevent stored water/groundwater communication <br /> 5.5.5 Groundwater— Specific Requirements <br /> Groundwater quality standards will be maintained during reclamation operations. Deviations <br /> from regulated water quality standards as a result of mining operations at Three Bells Mine <br /> will be reclaimed in an expedient and appropriate manner. <br /> The Three Bells Mine has no areas classified by the Water Quality Control Commission <br /> (WQCC)to be monitored for groundwater quality. Mining and reclamation activities in areas <br /> not classified by the WQCC will be carried out in such a manner to protect groundwater <br /> resources as outlined by the WQCC. <br /> Groundwater disturbances and interaction is anticipated to be minimal. Measures shall be <br /> taken to preserve existing groundwater resources as reclamation commences. Points of <br /> GEI Consultants,Inc. 17 June 2014 <br /> Three Bells Mine Reclamation Permit Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.