Laserfiche WebLink
CMC—Henderson Operations <br /> DRMS 2013 Annual Water Monitoring Report <br /> June 2014 <br /> 3.2.1 Point of Compliance Sampling Location: MLGW-7 <br /> ' Deviations below the NPL of 6.5-8.5 pH were observed at well location MLGW-7 in July, <br /> August and December of 2013. These pH values were 6.1, 6.2 and 6.4, respectively. Accelerated <br /> monthly monitoring was established in September, 2013 to better identify trends and assess <br /> water quality. A further summary of groundwater trends at MLGW-7 can be seen in the <br /> Groundwater Quality Assessment for MLGW-7, Technical Memorandum (AJAX and Clear <br /> Creek Associates, 2014). <br /> Tabular data for MLGW-7 is presented in Table 2 and provides a comparison to applicable <br /> NPLs. It should be noted that a new NPL of 5.9-8.5 pH for all Mill POC wells was proposed in <br /> ' the 5-Quarters Report (Aquionix, 2014). No other trends, deviations or exceedances were <br /> observed at MLGW-7 during 2013. Trend Evaluations 17-20 are included for MLGW-7. <br /> ' 3.2.2 Surface Water Sampling Location: WFR-20 <br /> WFR-20 is located upgradient of the Henderson Mill in the Williams Fork River and serves as an <br /> indicator of background surface water quality. Data suggests no apparent anomalies were <br /> ' observed in 2013. <br /> The specific conductivity value of 680.5 µS/cm, for the October 2012 monitoring event, has been <br /> identified as a statistical outlier based upon analysis via Dixon's method. <br /> Tabular data for WFR-20 is presented in Table 2 with accompanying Trend Evaluations 21-24. <br /> t 3.2.3 Surface Water Sampling Location: WFR-40 <br /> WFR-40 is located downgradient of the Henderson Mill in the Williams Fork River. Data <br /> suggests no apparent anomalies were observed in 2013. <br /> ' Tabular data for WFR-40 is presented in Table 2 with accompanying Trend Evaluations 25-28. <br /> ' 4.0 Groundwater Studies at the Mill <br /> An initial Groundwater Monitoring Point of Compliance (POC)Technical Memorandum(AJAX <br /> and Clear Creek Associates, May 2013)was completed and submitted to the DRMS in <br /> ' accordance with Section 3.2.6.1 of the Henderson Operations GWMP. The memo presented <br /> several preliminary recommendations, including completion of additional monitoring to provide <br /> data to support final determinations on potential POC locations,particularly below 1-Dam and 3- <br /> ' Dam in the Potato Gulch drainage area. The memorandum recommends that a POC location be <br /> established at MLGW-15 in addition to existing GWMP approved POC location MLGW-7 and <br /> MLGW-ACR. <br /> ' As previously mentioned, a Groundwater Quality Assessment for MLGW-7, Technical <br /> Memorandum(AJAX and Clear Creek Associates, 2014) was also prepared and submitted to the <br /> ' DRMS. This report was prepared in response to pH deviations at MLGW-7. <br /> A final report, 5-Quarter Water Quality Data and Baseline Parameters Report (Aquionix, 2014), <br /> was recently submitted to the DRMS in accordance with Section 4.2 of the Henderson GWMP. <br /> The purpose of the report was to establish MLGW-17 as a potential POC well, propose new pH <br /> NPL ranges for all POC well locations at the Mill, and summarize all 5-quarter baseline data for <br /> ' MLGW-15, MLGW-17 and MLGW-ACR. Upon approval of the proposed POC locations, <br /> ' 5 of 7 <br />