Laserfiche WebLink
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Surface excavation will consist of hand samples using a shovel Deeper samples will be <br />obtained using either an auger (track or wheeled vehicle), or a small backhoe. No roads will <br />be constructed. o other disturbance Is planned. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity <br />B. Drill Holes: Quantity <br />Average Width <br />Depth <br />C. Mud Pits: Quantity Average Width <br />Average Depth (ft) <br />Please see Item #7, page 6 of <br />(ft) Average Length (ft) the Exhibits. Sample depth will <br />vary from a few feet, to 20 ft. in <br />(ft) Diameter (in)[epth for auger holes. Backhoe <br />(ft) Average Length (ft) excavation depth may extend to 15 <br />ft. <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />No underground work is planned All prospecting will be above ground and consist of <br />waste dump sampling using shovel, vehicle mounted auger or a small backhoe. <br />F. Other Disturbances (please describe): <br />The affected areas are mostly barren mine dump /waste rock piles Other than the sites <br />sampled, no other disturbance is planned. Access will be off county or operator controlled <br />private roads and across historic mine dumps. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />No chemicals will be stored on any of the sample sites No fuel will be stored on site, The <br />auger, backhoe, pickups and supply truck will be either gas or diesel powered. No fueling <br />will occur on any of the sampled sites or waste dumps. Vehicles will go off site to be <br />F. New Road(s): Length 0.00 (ft) Width 0.00 (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />None <br />