Laserfiche WebLink
3 (FORM 2 - Public filing) <br />I. LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />J. Are prospect sites e. drill holes, trench locations, etc... staked on the ? NO <br />p pe ( g.> ) ground. Yes No <br />K. Specify the Land Management Agency, Address and Telephone Number: <br />No BLM or USFS lands involved. <br />L. The prospector is required to document that the NOI has been sent to the BLM or the USES. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NOI for BLM Land <br />L" J Evidence of notification is attached to this NOI for USFS Land. (Note: No BLM or USFS lands involved, <br />Other proof of notice is attached to this NOI the document page would not let us unmark the <br />choices.) <br />II. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />3. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />4. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. This includes the location of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />7. Mineral(s) and/or Resource(s) being Investigated: Gold, silver, Zinc, lead <br />8. Estimated dates of commencement and completion: <br />Commencement: 06/10/2014 <br />Completion: 09/30/2016 <br />17.30 Tons <br />9. Amount of material to be extracted, moved or proposed to be moved: <br />10. Identify the type or method of prospecting proposed and quantity (P lace an "X" ) Assumes 11lbs. /gat. X 3,5 gal. buckets/sample <br />location, X 15 sample sites /dump X 14 waste <br />/ Cuts Pits Trenches dumps. Hand samples, auger and backhoe <br />1/ hafts Tunnels Adits Declines samples. <br />it Drilling Fluid Drilling Drilling & Blasting <br />