Laserfiche WebLink
ANNUAL REPORT . For 2013 <br /> I have no changes to report on this years report . Work done at mine site consisted of core drilling from <br /> inside the Charlene tunnel. Several pickup loads stock piled ore were hauled to the mill site on return <br /> trips from the mine and hand shoveled over a mechanical screen and sluiced. Weeds were spot sprayed <br /> at mine site with hand sprayer consisting mostly of Canadian thistles. The weeds at the mill site and <br /> surrounding area were spot sprayed with small sprayer towed behind a four wheeler in august 2013. <br /> These weeds also consisting mostly of Canadian thistles. The electricity is currently off at the mill and <br /> is not in use at this time. <br /> James Potts May 30 2014 <br />