My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-04_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2014-06-04_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:31 PM
Creation date
6/4/2014 9:55:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
6/4/2014
Doc Name
Bond Release Request
From
Seneca Coal Company
To
DRMS
Type & Sequence
SL6
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seneca 11 Mine <br />SL -6 Phase 111 Bond Release Request <br />June 2014 <br />sample adequacy, the upper limit of the possible values of the true mean was determined for the <br />mountain brush reference area for 2011 and 2012. See pages 5, 19 and 25 in the revegetation <br />evaluation report (Report) contained in Attachment D for a discussion of the determination <br />method. The mountain brush reference area sample adequacy issue and true mean determination <br />method was presented to CDRMS on March 12, 2012 by ESCO Associates on behalf of SCC. <br />Jason Musick responded for CDRMS on April 2, 2012 that this approach would be acceptable. <br />Sampling results and statistics for total first hit cover and allowable first hit herbaceous cover are <br />summarized below in Tables 2 and 3. See pages 18, 19 and 25 and Table C -4 in the Report <br />contained in Attachment D. <br />Table 2. 2011 and 2012 Data and Sample Adequacy Summary for Total First Hit Cover, <br />Phase III BRB -5 and Sagebrush and Mountain Brush Reference Areas. <br />Area <br />Total First Hit Cover (x) <br />s <br />N <br />Nm;„ <br />t <br />Phase III Bond Release BRB -5 <br />2011 <br />63.5 <br />11.5 <br />30 <br />6 <br />1.311 <br />Mountain Brush RA 2011 <br />85.3 <br />5.9 <br />21 <br />1 <br />1.325 <br />Sagebrush RA 2011 <br />74.3 <br />5.9 <br />15 <br />2 <br />1.345 <br />Phase III Bond Release BRB -5 <br />2012 <br />36.9 <br />9.1 <br />35 <br />11 <br />1.310 <br />Mountain Brush RA 2012 <br />79.8 <br />8.1 <br />18 <br />2 <br />1.333 <br />Sagebrush RA 2012 <br />47.2 <br />8.7 <br />15 <br />7 <br />1.345 <br />Table 3. 2011 and 2012 Data and Sample Adequacy Summary for Allowable First Hit <br />Herbaceous Cover, Phase III BRB -5 and Sagebrush and Mountain Brush Reference <br />Areas. <br />7 <br />Allowable First Hit <br />Area <br />s <br />N <br />N,„;,, <br />t <br />Herbaceous Cover (x) <br />Phase III Bond Release BRB -5 <br />59.7 <br />11.3 <br />30 <br />7 <br />1.311 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.