Laserfiche WebLink
May 27, 2014 C- 1981- 012/New Elk Mine <br />the shop area flowing into the clean water diversion system <br />LOU- <br />Abatement #: 3 <br />Abatement Due Date: 9/16/2013 <br />Abatement Due Extended Date: <br />Abatement Description: Grade the channel where culvert C4 was removed to prevent the <br />impoundment of water <br />Abatement #: 4 <br />Abatement Due Date: 9/16/2013 <br />Abatement Due Extended Date: <br />Abatement Description: Restore the berm at the "new water tank" SAE to its approved design <br />Abatement #: 5 <br />Abatement Due Date: 9/30/2013 <br />Abatement Due Extended Date: <br />Abatement Description: Clear vegetation, rocks and non -coal waste, and reshape and grade the <br />following ditches as necessary to restore them to the approved design: clean water diversion ditch above <br />West Fan; D29; D29B; D7; D9; D26 <br />Abatement #: 6 <br />Abatement Due Date: 9/30/2013 <br />Abatement Due Extended Date: 11/4/2013 <br />Abatement Description: Restore culvert C41 to its approved design, and backfill and grade <br />around the inlet <br />Abatement #: 7 <br />Abatement Due Date: 9/30/2013 <br />Abatement Due Extended Date: <br />Abatement Description: Clear the upland diversion ditch above the RDA of fallen rocks and trees <br />Abatement #: 8 <br />Abatement Due Date: 9/30/2013 <br />Abatement Due Extended Date: <br />Abatement Description: Survey the entire length of the upland diversion ditch above the RDA to <br />allow comparison of constructed ditch with the approved design <br />Infraction Number: CV2013009 <br />Inspection Date: <br />Date Issued: November 25, 2013 <br />Primary Topic: Hydrologic Balance <br />Secondary Topic: Processing Waste <br />Tertiary Topic: <br />Description: Failure to construct and maintain the RDA upland diversion ditch in compliance <br />with the approved design, in violation of rules 4. 10.3(2) and 4.09.2(7) <br />Abatement #: 1 <br />Abatement Due Date: 1/24/2014 <br />Abatement Due Extended Date: 4/30/2014 <br />Abatement Description: Construct the RDA upland diversion ditch so that is in compliance with <br />the approved design <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 4 of 6 <br />