Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#012 Page 2 of 2 <br /> Dozing method: _ 1.100 _ (50%SL) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.095 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.9196 <br /> Adjusted unit production: 1,143.25 LCY/hr <br /> Adjusted fleet production: 1143.25 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.222/LCY <br /> Total job time: 3.99 Hours_ <br /> Total job cost: $1,012.78 <br /> CIRCES Cost Estimating Software <br />