Laserfiche WebLink
Pagel of 2 <br /> BULLDOZER WORK <br /> Task description: _Replace Topsoil-<200 ft push <br /> Fremont Paving&Redi-Mix Permit Action: <br /> Site: Pit TCO1 Update Permit/Job#: M1988093 <br /> PROJECT IDENTIFICATION <br /> Task#: 012 State: Colorado Abbreviation: None <br /> Date: 5/21/2014 County: Fremont Filename: M09.3-012 <br /> User: TC 1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat 139T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: _ $72.57 _NA <br /> Operating Cost/Hour: $143.16 100 _ <br /> Ripper op.Cost/Hour: $0.00 0 _ <br /> Operator Cost/Hour: $38.01 NA <br /> Total unit Cost/Hour: $253.73 <br /> Total Fleet Cost/Hour: $253.73 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 3,710 <br /> Swell factor: 1.230 <br /> Loose volume: 4,563 LCY <br /> Source of estimated volume: Original Application,Exhibit L <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly production: 1,243.2 LCY/hr <br /> Materials consistency description: Partly consolidated stockpile 1.1 <br /> Average push gradient: -5% <br /> Average site altitude: 5,300 feet <br /> Material weight: 2,100 lbs/LCY <br /> Weight description: Earth-Loam <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.100 (CAT HB) <br /> CIRCES Cost Estimating Software <br />