Laserfiche WebLink
Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil->200 ft haul <br /> Fremont Paving&Redi-Mix Permit Action: <br /> Site: Pit_ TC01 Update Permit/Job#: M1988093 <br /> PROJECT IDENTIFICATION <br /> Task#: 011 State: Colorado Abbreviation: None _ <br /> Date: 5/21/2014 County: Fremont Filename: M093-011 <br /> User: TC 1 — --- <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 631 G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equi ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $80.91 NA NA NA NA NA <br /> Operating cost/hour: $170.75 NA NA NA NA NA <br /> Ripper op.cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $33.56 NA NA NA NA NA <br /> Unit Subtotals: $285.22 NA NA NA NA NA <br /> Number of Units: 1 0 0 0 0 0 <br /> Group Subtotals: Work: $285.22 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $285.22 <br /> MATERIAL QUANTITIES <br /> Initial volume: 5,565 CCY Swell factor: 1.230 <br /> Loose volume: 6M5 LCY <br /> Source of estimated volume: Original Application,Exhibit L <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Loam Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds _ Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />