My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-20_REVISION - M1977361
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977361
>
2014-05-20_REVISION - M1977361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:13 PM
Creation date
5/23/2014 9:51:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977361
IBM Index Class Name
REVISION
Doc Date
5/20/2014
Doc Name
Preliminary adequacy review AM01
From
DRMS
To
CEMEX
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wilson <br />Page 2 <br />May 20, 2014 <br />6.3.3 Exhibit C — Mining Plan <br />1. The Applicant has indicated that it will be necessary to import topsoil to achieve a suitable <br />depth of topsoil over reclaimed areas. Please specify at what point during the life of the mine <br />the topsoil will be imported. <br />2. As required by Rule 6.3.3(h), specify how much water will be used in conjunction with the <br />operation and identify the source of the water. <br />3. Upon reviewing the original permit file for the CEMEX Sandstone Quarry, it was determined <br />that the Operator has never addressed the use of explosives at the mine site. As required by <br />Rule 6.3.3(p), the Applicant must demonstrate, pursuant to Subsection 6.5(4), Geotechnical <br />Exhibit, that offsite areas will not be adversely affected by blasting during mining and <br />reclamation operations. Please provide the following information: <br />a) How frequently does blasting occur? <br />b) Specify the blast pattern <br />c) Provide a cross section of a typical hole profile <br />d) Specify the delay timing <br />e) Specify the air overpressure <br />f) Specify the peak particle velocity <br />g) Specify the maximum weight of explosives detonated in an 8 millisecond period <br />4. Please provide a commitment to complete a blasting report for each shot. The report must be <br />retained by the Operator for at least 3 years and be available for inspection by the Division <br />on demand. The record shall contain the following data: <br />a) Location, date and time of blast; <br />b) Name, signature, and license number of blaster -in- charge; <br />c) Identification, direction and distance in feet, from the nearest blast hole to the nearest <br />potentially affected structure, such as any dwelling, school, church, or community or <br />institutional building either: <br />i. Not located in permit area; or <br />ii. Not owned nor leased by the person who conducts the mining operations. <br />d) Weather conditions, including temperature, wind direction, and approximate velocity; <br />e) Type of material blasted; <br />f) Sketches of the blast pattern including number of holes, burden, spacing, and delay <br />pattern. Sketches shall also show decking, if holes are decked to achieve different delay <br />times within a hole; <br />g) Diameter and depth of holes; <br />h) Types of explosives used; <br />i) Total weight of explosives used per hole and maximum weight of explosives per 8- <br />millisecond period; <br />
The URL can be used to link to this page
Your browser does not support the video tag.