My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-05-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:09 PM
Creation date
5/23/2014 9:46:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/21/2014
Doc Name
Weekly construction quality assurance report week ending 5/10/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4W It AM <br />A Cat 330 excavator and a D6 GPG dozer trenched for the Low Volume Solution Collection (LVSC) riser piping in <br />the southeast comer of the PSSA between the closure drains and the 9450' elevation bench. <br />A Cat 330 excavator loaded material excavatE d from above underground working # 6273 into Cat 740 haul trucks. <br />The material was placed as structural fill using a Cat dozer between the %:1 slope and ADR platform. The fill was <br />compacted by a Cat CS56 smooth drum roller The structural fill was placed and compacted per project <br />specification. Fine materials were used to fini h slope grades at the 9450 elevation near the ADR Platform. <br />A Cat CS56 smooth drum roller compacted the subgrade between stations FF+00 to FF2+00 and DD2+00 to <br />DD7+00 as well as downslope of stations B10 0 to B12+00. <br />A D6 dozer was used to place cut to fill at the <br />smooth drum roller compacted the area per pr <br />Cat dozers cut the slopes to rough grade betty <br />downslope of stations B4+00 to B6+00, C0+0( <br />The Phase 1 Diversion Channel was lined witt <br />channel outlet of the sedimentation pond crest <br />A Cat 330 excavator and a Cat 330 excavator <br />Q2+00 above the' / ::1 slope. <br />e 2 Diversion Channel near stations 8+00 to 10+00. A Cat CS56 <br />specification. <br />en stations H10+00 to H18+00and F12+00 to F22+00 and <br />to C4+00, GQ+00 to G2+00, and A5+00 to Al 5+00. <br />12-oz. non -woven geotextile fabric and D5o =6" rip rap from the <br />to approximately station 4 +00. <br />a rock hammer broke apart and cut down material near station <br />A Cat dozer graded material upslope at statio J1+00 to J2+00 creating an access ramp to the ADR haul road fill <br />area. The haul road access ramp is for future Soil Liner Fill haulage from the Cameron. <br />Note: An AMEC field professional monitored structural fill material temperatures placed within fill areas. Average <br />structural fill temperatures were above 32 °F. <br />Clay (SLF) Processing: <br />Cameron Site: No clay mining or processing occurred at the Cameron Site. Approximately 244,860 tons of clay <br />soil liner fill (SLF) material have been produced at the Cameron site. SLF produced from the operation remains <br />stockpiled at Cameron Site for future use. <br />Squaw Gulch Clay Borrow Site: Clay minino and processing occurred at the Squaw Gulch Clay Borrow Site. <br />Approximately, 125,400 tons of soil liner fill ma erial has been produced at the Squaw Gulch Clay Borrow Site to <br />date. <br />Underdrain System: <br />Primary Underdrain: No work occurred on <br />Secondary Underdrain: No work occurred <br />Tertiary Underdrain: No work occurred on <br />Tree Grubbing and Clearing, Chipping: <br />No clearing or grubbing occurred. <br />B) Underground Workings <br />• Confirmatory Drilling <br />No confirmatory drilling occurred. <br />• Remediation <br />primary underdrain. <br />the secondary underdrain. <br />tertiary underdrain. <br />Page 2 of 7 MLE2 WE 10 May 2014. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.