Laserfiche WebLink
below spillway outlet or depth of water in pond measured from the bottom of the <br />pond. <br />The following sixteen drill holes will be monitored: DH -15, DH -25, DH -38, DH -39, <br />DH -49, DH -65, DH -67B, DH -67D, DH- 67Abv, DH- 6713Iw, TC- 03- 01(B), TC- 03 -02, <br />CW I- DH -58, CW I- DH -60, 2010 -1 SS and 2010-113. Depending on weather <br />conditions, the first quarter monitoring event may be delayed until April or May. Field <br />parameters will be measured each quarter. A full suite sample will be obtained semi- <br />annually during the second and fourth quarters. <br />The Deer Trail Ditch will be monitored at the designated upstream and downstream <br />monitoring locations (designated "DTD" on Map 9). Field parameters will be <br />measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. During August of each year a <br />sample will be obtained and analyzed for the parameters on List 2. <br />Hubbard Creek and Terror Creek will be monitored quarterly at the designated <br />upstream and downstream monitoring locations shown on Map 9. Field parameters <br />will be measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. <br />Hubbard Creek and Terror Creek flow will be measured at the upstream and <br />downstream monitoring locations by the USGS. The stream gaging stations are to <br />be installed by the USGS during 2001 under a cooperative (cost sharing) agreement <br />between the Operator, Delta County and the USGS. <br />The Fire Mountain Canal will be monitored 3 times per year during May, July and <br />September at the designated upstream and downstream monitoring locations shown <br />on Map 9. Field parameters will be measured during each monitoring event. A full <br />suite sample from List 1 will be obtained semi - annually during the first and third <br />monitoring event. <br />Freeman, Sheep Corral, Stevens and Dove Gulches will be monitored quarterly at <br />the designated upstream and downstream monitoring locations shown on Map 9. <br />Field parameters will be measured each quarter. A full suite sample from List 1 will <br />be obtained semi - annually during the second and fourth quarters. <br />PR -13 2.05-117 02/13 <br />