My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-19_GENERAL DOCUMENTS - C1981014 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981014
>
2014-05-19_GENERAL DOCUMENTS - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:05 PM
Creation date
5/20/2014 1:29:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
5/19/2014
Doc Name
Response & Attachments - EFCI
From
Rich Munson
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
DAB
JLE
JHB
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K2T LLC <br />South Central Land & Mining LLC <br />19 May 2014 <br />Page 8 <br />Energy Fuels had pulled all of the pillars except under the refuge pile. We do not believe that we <br />were compensated for their removal. <br />Response: EFCI does not owe the Appellants any further sums for coal mined from the land which <br />the Vento Trust Group now owns. <br />EFCI performed its operations in accordance with its rights under the coal leases that covered the <br />land and coal which the Trento Trust Group now owns. Royalties on all coal mined from these lands <br />was duly paid to the predecessors in interest to the Trento Trust Group. The Vento Trust Group <br />along with South Wind Land and Mining LLC, were also paid the sum of $450, 000 by EFCI under <br />the terms of a Settlement Agreement, General Release, and Covenant not to Sue that covered all <br />claims that were made or could have been made by Appellants in the litigation that preceded the <br />Settlement Agreement. <br />Item No. 7: <br />The reclamation plan was for ten years. EFCI has never been fined for not complying to that time <br />table. <br />Response: The ten year plan did not establish a maximum period of time to achieve the required <br />goals of the reclamation process. <br />Item No. 8: <br />Drill holes. Over the past year, Linda Saunders has requested a complete list of the drill holes, drill <br />core sample information and their locations from George Patterson. Our understanding is that <br />Energy Fuels will need to fill each one before final reclamation but we would appreciate having <br />them identified as soon as possible, following up on our request to Janet Binns on July 1, 2013. <br />Response: A copy of the Geology Map showing the location of the known drill holes was provided <br />to Ms. Saunders in 2012. <br />Item No. 9: <br />Subsidence: We are concerned about possible subsidence at the Vento office building and County <br />Road 93. Also it seems that County Road 15 has subsided and the Florence water line is in the <br />middle of it. These need to be addressed and remediated as soon as possible for public safety and <br />definitely before the final subsidence report which was delayed from 2012 until 2013 and it's now <br />April 2014, Reference: <br />Response: The Subsidence Report required under the permit for Southfield has been completed in <br />2014 and recorded subsidence is within the predicted limitations of the approved permit. <br />Item No. 10: <br />
The URL can be used to link to this page
Your browser does not support the video tag.