My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-20_PERMIT FILE - M2014028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014028
>
2014-05-20_PERMIT FILE - M2014028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:08 PM
Creation date
5/20/2014 10:50:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014028
IBM Index Class Name
PERMIT FILE
Doc Date
5/20/2014
Doc Name
New application
From
Huerfano County Government
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(8) The Operator's /Applicant's and Landowners' choice of rangeland reclamation for cattle <br />production will require slopes of 3H: 1V or flatter in order to establish good cattle grazing <br />areas, and to prevent erosion. Farm machinery will be used only at the time of revegetation <br />and will not be a factor long range. <br />(9) The Operator /Applicant, in conjunction with the landowners will use reject /overburden only <br />to fill areas within the MLRB Permit boundary. No inert structural fill is planned for fill at this <br />site. If it becomes necessary to import inert structural fill to accomplish the reclamation of this <br />mine site the operator will provide the DRMS Office notice and proceed with the following <br />requirements as laid out in the Rules. <br />(a) a narrative that describes the approximate location of the proposed activity; <br />(b) the approximate volume of inert material to be backfilled; <br />(c) a signed affidavit certifying that the material is clean and inert as defined in Rule <br />1.1(20) <br />(d) the approximate dates that proposed activity will commence and end, however, <br />such dates shall not be an enforceable condition; <br />(e) an explanation of how the backfilled site will result in a post- mining configuration <br />that is compatible with the approved post- mining land use; and <br />(f) a general engineering plan stating how the material will be placed and stabilized in <br />a manner to avoid unacceptable setting and voids. <br />The items listed above will only be called upon if inert structural fill would be needed. Which <br />is unlikely on this site? <br />
The URL can be used to link to this page
Your browser does not support the video tag.