My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-20_PERMIT FILE - M2014028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014028
>
2014-05-20_PERMIT FILE - M2014028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:08 PM
Creation date
5/20/2014 10:50:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014028
IBM Index Class Name
PERMIT FILE
Doc Date
5/20/2014
Doc Name
New application
From
Huerfano County Government
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) All grading shall be done in a manner to control erosion and siltation of affected lands. All <br />means will be taken to prevent soil erosion. No highwalls will be left after mining. Best <br />Management Practices will be used to protect areas outside the affected land from slides and <br />other damage. No highwalls are planned at this open pit mine. <br />(4) All backfilling and grading will be completed as soon as feasible after the mining process. <br />The operator will establish reasonable timetables consistent with good mining and <br />reclamation procedures. Grading of backslopes will be concurrent with mining, and the pit <br />floor will be contoured for seeding as mining proceeds. Backsloping will be synchronized with <br />mining as stated above. Topsoiling will be accomplished after mining has moved away far <br />enough to make it practical for seedbed prep and seeding. In addition, time of year and <br />weather conditions will play a role in this timing. The NRCS recommendations will be followed <br />for seeding and time of year to plant. <br />(5) No refuse will be generated by this mining operation for cleaning and preparation of <br />substances mined. No acid - forming or toxic - producing materials will be mined or used for <br />processing at this sand and gravel mining - processing plant. Therefore, no plans have been <br />developed for their handling. <br />(6) There will not be any drill or auger holes unfilled after mining. All exploration will most <br />likely be done with small bore coring by a trained crew or by backhoe in selected areas, and <br />after discovery, all holes shall be backfilled as soon as possible. No adits or shafts will be <br />employed in this open pit. <br />(7) Maximum slopes and slope combinations shall be compatible with the configuration of the <br />surrounding conditions and selected land use. Where the pit does not daylight, backsloping <br />during mining will be completed at a slope of 3H: 1V or flatter. No lakes or ponds are <br />designed for the final reclamation, which is rangeland. Therefore, no swimming areas are <br />proposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.