My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-16_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-05-16_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:04 PM
Creation date
5/20/2014 9:15:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/16/2014
Doc Name
Weekly construction quality assurance report week ending 5/3/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alk <br />W <br />CQA ACTIVITIES: <br />in Field Activities: Observation of construction activities during this reporting period Included: Slope grading mid fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remedlation and confirmatory <br />drilling; Production drilling and blasting; Testing and sampling of SF, SLF, DCF and concrete from UG U6273; Rip rap <br />placement at the Phase 1 pond spllhnvay; and secondary underdrain installation. <br />1n Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density relationships, gradations, material classification, Identifications, and field material sampling were <br />performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />➢ Structural Fill sample number SF-80R <br />➢ Drain Cover Fitt sample numbers DCF 76 <br />➢ Sop Liner FIti sample numbers SLF 139-S and SLF -140S <br />9 Physical properties test of concrete and cylinders were cast for compressive strength testing from underground <br />working #6273 <br />Note: Samples labeled with the suffix OW are samples of Record / QA samples; those without are QC samples. <br />General Project items <br />Meetings and Discussions: The Contractor Meeting occurred on April 30, 2014 with CC &V Projects, AMEC, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, AMEC, and Ames. <br />Miscellaneous: <br />➢ Drain cover fill processing continued. <br />Mp rep ping continued. <br />Deliveries: None <br />Submitted by: ,Eric Lorenson Date: 05- 052014 <br />Reviewed By: f—' �- �� Date: 05-052014 <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 719.689.2986 <br />Approved By. Date: S ~ ~ <br />cC &v Projects <br />Page 4 of 7 MIM WE 3 May 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.