My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-16_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-05-16_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:04 PM
Creation date
5/20/2014 9:15:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/16/2014
Doc Name
Weekly construction quality assurance report week ending 5/3/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underdrain System: <br />Primary Underdrain: No work occurred on the primary underdrain. <br />Secondary Underdrain: Approximately 130 lineal feet of secondary underdrain was constructed per design plans <br />west of Dump 4. <br />Tertiary Underdrain: No work occurred on the tertiary underdrain. <br />Tree Grubbing and Clearing, Chipping: <br />A Cat 330 excavator removed trees and cleared and grubbed topsoil and deleterious material from near the <br />Phase 2 Storm Water Diversion Ditch at approximate stations 3+00 to 6+00. <br />B) Underground Workings <br />• Confirmatory Drilling <br />Confirmatory drilling occurred at underground working #6446 (part of the Anaconda complex). Further <br />remediation efforts are required. <br />• Remediation <br />Approximately 200 yds3 of 4,000 PSI concrete was placed in underground working #U6273. Concrete physical <br />property testing occurred and concrete cylinders were cast for laboratory determination of compressive strength. <br />Additional remediation is required. <br />Underground workings #6112, #6285, #6310, #6311, #6390, and #6561 were excavated to competent rock, <br />backfilled with structural fill per project specification, and are considered remediated. <br />A Cat 330 excavator began excavating working #6557. Additional remediation is required. <br />Timbers were found at underground working #6560 at a depth of about 5 to 7 feet. Work stopped due to equipment <br />breakdown. Additional remediation is required. <br />AMFS survey located 12 additional unknown surface workings located near the Phase 2 Diversion Ditch and <br />Perimeter Road. <br />n) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />Page 3 of 7 MLE2 WE 3 May 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.