Laserfiche WebLink
May 13, 2014 C- 1982- 056/Foidel Creek Mine MPB <br />Portions of the RDA were inspected. Material was being hauled to the RDA. Topsoil replacement was underway <br />at the first bench (see Photograph No. 4). The second bench is near completion and appeared stable. The rock <br />under -drain was viewed and is being constructed as designed with three different grades of rock placed as <br />construction progresses (Photograph No. 5). <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />The main access road into the permit area was in good condition and well graded. Roads accessing Twenty Mile <br />Park surface facilities areas were also in good condition. The access roads leading to the RDA were muddy but <br />passable. <br />SUPPORT FACILITIES - Rule 4.04: <br />Various support facilities that were accessible located in Twenty -Mile Park were observed. The Fish Creek Water <br />Treatment Facility is shown in Photograph No. 6. The portal areas, shop, and related surface facilities were well <br />kept. Perimeter areas at these locations were maintained, and no problems were noted at any of the various <br />support facilities during this inspection. <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 6 <br />