My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-22_PERMIT FILE - C1980004A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2014-04-22_PERMIT FILE - C1980004A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 7:30:47 AM
Creation date
5/15/2014 1:11:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
4/22/2014
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3.7 -1 Page 14 <br />BULLDOZER RIPPING WORK <br />Task description: Rip Backfilled and Rough Graded Areas <br />Site: McClane Canyon Mine Permit Action: MT7 Permit/Job#: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 008 State: Colorado Abbreviation: None <br />Date: 12/30/2013 County: Garfield Filename: C004 -008 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU Horsepower: 405 <br />Ripper Attachment: 3 -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Seismic: <br />Area: <br />Cost Breakdown: <br />6.70 acres Rip Depth (ft): <br />Source of estimated quantity: Opel <br />HOURLY PRODUCTION <br />Seismic: <br />2.00 <br />Estimate <br />Volume: 21,619 <br />NA <br />Seismic Velocity: <br />NA <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper Operating Cost/Hour: <br />$7.96 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total Unit Cost/Hour: <br />$265.84 <br />feet <br />Total Fleet Cost/Hour: <br />$265.84 <br />feet <br />MATERIAL QUANTITIES <br />Selected estimating <br />method: Area <br />Alternate Methods: <br />NA Bank Volume: NA <br />BCY <br />6.70 acres Rip Depth (ft): <br />Source of estimated quantity: Opel <br />HOURLY PRODUCTION <br />Seismic: <br />2.00 <br />Estimate <br />Volume: 21,619 <br />NA <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.63 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.838 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.838 <br />Acres/hr <br />Site Altitude: <br />5,600 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.70 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.70 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />9.64 <br />Unit cost: $382.405 Per acre <br />Total job cost: <br />$2,562.00 <br />BCY or CCY <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.