Laserfiche WebLink
Scraper Worksheet Cont'd <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Task # 007 <br />0.70 Minutes <br />0.60 Minutes <br />Table 3.7 -1 Page 13 <br />Page 2 of 2 <br />Site Altitude: 5600 feet <br />Net Correction: <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad: <br />1.000 <br />NA <br />CAT HB <br />Job Efficiency: <br />0.830 <br />NA <br />CAT HB <br />Table 3.7 -1 Page 13 <br />Page 2 of 2 <br />Site Altitude: 5600 feet <br />Net Correction: <br />0.830 <br />NA <br />Roll. Res <br />% <br />Travel Time: <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />Road Condition: <br />Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />3.00 <br />Haul Route: <br />2938 <br />0.41 <br />LCY/Hour <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />% <br />(min) <br />1 <br />1000.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />0.79 <br />Haul Time: 0.79 minutes <br />Return Rmite' <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />0.41 <br />Return Time: <br />0.41 <br />minutes <br />Total Scraper team cycle time: <br />2.50 <br />minutes <br />Adjusted for job conditions: <br />375.49 <br />LCY/Hour <br />Selected Number of Scrapers: <br />1 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />375.49 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />375.49 <br />LCY/Hour <br />Unadjusted unit production/hour: 452.40 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.727 /LCY <br />Total job time: 24.97 Hours <br />Total job cost: $6,813.31 <br />CIRCES Cost Estimating Software <br />