My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-13_REPORT - C1996083 (4)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-05-13_REPORT - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:58 PM
Creation date
5/14/2014 8:17:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
5/13/2014
Doc Name
April 2014 Vibrating Wire Piezometer Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAVDA \o. 2 r <br />i 013,19 -0001 , 11uddiv [I -t)rm <br />{15W/141 �;a; �•, .., . z << <br />Discussion <br />As indicated in the referenced report, the stability of CWDA No. 2 is sensitive to increases in <br />pore pressures in VVL'P -08. An increase in the bore pressure of 3 psi in VWP -08 Nvould result in <br />a reduction of the Factor of Safety to below 1.5. <br />As indicated in the monitoring data, very slight increases in pore pressures were reported it) <br />VWP -09 and VWP -10. However, no change was observed in VWP -08. In addition, the pore <br />pressures in VWP -05 and VWP -06 showed a slight decrease over the one month period. <br />In general, based upon the results of the recent pore pressure monitoring data, HBE,T does not <br />believe that there is any reduction in the stability of CWDA No, 2. However, in accordance with <br />DBMS guidance, HBET will continue to cotaduct monthly monitoring of the piezometers for the <br />next several months in alt effort to detect any pore Pressure increases which may adversely <br />impact the stability of CWDA No. 2 resulting from waste placement operations. <br />We are pleased to be of service to your project. Please contact us it you have ally questions or <br />comments regarding the contents of this report. <br />Respectfully Submitted: <br />Huddleston- Bei-qv En ;incising and Testing, LLC <br />'411, <br />Michael A. <br />Vice President of Engineering <br />;2008 ALL PROJECTS'004D - Jr Slo er Associne; Me004 89.0001 I1mvie MirtcQ00 - Gc&00489.0003 I RO306[4 -doe 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.