My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2014-05-05_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:45 PM
Creation date
5/13/2014 9:51:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
HYDROLOGY
Doc Date
5/5/2014
Doc Name
Groundwater characterization report
From
Golder Associates
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2014 <br />Table 2: Hydraulic Testing Results Summary <br />Notes: <br />1 /MW -2 was estimated because water levels recovered to higher levels than "static" at the beginning of the <br />test (Secor 1998). <br />2 /Recovery too rapid and water displacements too small in slug tests conducted in monitoring well MW -5 for <br />analysis. <br />3 /Recovery too slow to conduct meaningful slug test in MW -6; depth to water exceeded commonly available <br />pressure transducer cable lengths. <br />N /A: Not Available. <br />1110 \81640A\ 0400\ GWCharWelllnstall Field Rep _Fnl- 28Apr14 \Tables \Table 2 Hydraulic Testing Results Summary_Draft_02_26_2014.xlsxSheetl <br />103- 81640A <br />(aGolder <br />Associates <br />Hydraulic <br />Hydraulic <br />Monitoring <br />Test Method <br />Conductivity <br />Conductivity <br />Well <br />cm /sec <br />(ft/day) <br />MW -1 <br />Slug (rising head) <br />9.2 x 10 -' <br />2.6 x 10 -3 <br />MW -2 1/ <br />Slug (rising head) <br />4.9 x 10 -10 <br />1.4 x 10 -6 <br />MW -3 <br />Slug (rising head) <br />7.1 x 10 -9 <br />2.0 x 10 -6 <br />MW -4 <br />Slug (rising and falling head) <br />5.0 x 10 -' <br />1.4 x 10 -3 <br />MW -5 2/ <br />Slug (rising and falling head) <br />See notes <br />See notes <br />MW -6 3/ <br />None <br />N/A <br />N/A <br />Wireline Packer from 55 -61 feet <br />2.3 x 10 -6 <br />6.5 x 10 -3 <br />MW -7 <br />Wireline Packer from 251 -271 feet <br />2.9 x 10-6 <br />8.3 x 10 -3 <br />Wireline Packer from 261 -271 feet <br />4.0 x 10 -6 <br />1.1 x 10 -2 <br />Notes: <br />1 /MW -2 was estimated because water levels recovered to higher levels than "static" at the beginning of the <br />test (Secor 1998). <br />2 /Recovery too rapid and water displacements too small in slug tests conducted in monitoring well MW -5 for <br />analysis. <br />3 /Recovery too slow to conduct meaningful slug test in MW -6; depth to water exceeded commonly available <br />pressure transducer cable lengths. <br />N /A: Not Available. <br />1110 \81640A\ 0400\ GWCharWelllnstall Field Rep _Fnl- 28Apr14 \Tables \Table 2 Hydraulic Testing Results Summary_Draft_02_26_2014.xlsxSheetl <br />103- 81640A <br />(aGolder <br />Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.