Laserfiche WebLink
April 2014 <br />Table 1: Monitoring Well Construction Summary <br />103- 81640A <br />Notes: 1- Coordinates are in Colorado State Plane North Grid NAD 83 and elevations are on NAD 88 datum. Top of well pads about 6 inches above land surface. <br />2- MW -5 through MW -7 installation date is date the well, filter pack and grout placement were installed in the borehole, but completion with concrete pad, <br />bollards and protective steel riser was conducted at a later date. <br />3- Well total depths for MW -1 through MW -4 measured by Golder 7/30/2010 from the top of the PVC well casing top; bls = below land surface. Borehole <br />and well construction logs were unavailable for MW -4. Information provided for MW -4 was obtained from a video survey of the well performed on July <br />30, 2010. MW -1 well casing likely extended sometime after construction based on differences in drilled depth based from borehole log and total depth <br />measurement made 7/30/2010; was reduced by 0.30 feet on 01/10/2013 to enable closing and securing the steel protective riser lid. <br />4- Screened interval is the depth interval of the nominal length of the screen pipe section, and not the actual measured length of the perforations provided <br />on the well construction diagrams. <br />I: \10 \81640A\ 0400\ GWCharWelllnstallFieldRep _Fnl- 28Apr14 \Tables \Table 1 Monitoring Well Construction Summary_Draft_02142014.x1sx <br />Golder <br />Associates <br />Elevation <br />Elevation <br />Well <br />Well <br />Screened <br />Filter Pack <br />Bentonite <br />Well <br />Easting' <br />Northing' <br />, PVC T o <br />p <br />Concrete <br />� <br />Installation <br />Well Material <br />Depth s <br />Interval a <br />Interval <br />Seal <br />Interperted <br />No. <br />(feet) <br />(feet) <br />Pad Top <br />2 <br />Type <br />Interval <br />Screened Unit <br />(feet) <br />Date <br />(ft bgs) <br />(ft bgs) <br />(ft bgs) <br />f <br />ft bgs) <br />MW -1 <br />3097466 <br />1486791.74 <br />5272.09 <br />5269.95 <br />6/2/1998 <br />2 "/ SCH40 PVC <br />65.9 <br />6-26 <br />5 - 26 <br />1 -5 <br />Niobrara /Codell <br />Contact <br />MW -2 <br />3097623 <br />1487456.76 <br />5266.03 <br />5263.95 <br />6/1/1998 <br />2 "/ SCH40 PVC <br />112 <br />89-109 <br />87-109 <br />81.5-87 <br />Niobrara /Codell <br />Contact <br />MW -3 <br />3097729 <br />1486250.38 <br />5261.03 <br />5258.8 <br />6/1/1998 <br />2V SCH40 PVC <br />107.2 <br />84-104 <br />81.5 - 113 <br />77.5-81.5 <br />Niobrara /Codell <br />Contact <br />MW -4 <br />3098893 <br />1484259.44 <br />5246.13 <br />5243.77 <br />April, 1999 <br />2 "/ SCH40 PVC <br />188.3 <br />-168-188 <br />unknown <br />unknown <br />unknown <br />MW -5 <br />3097214 <br />1489893.21 <br />5276.42 <br />5273.86 <br />11/30/2012 <br />2 "/ SCH40 PVC <br />57.4 <br />37.3-57.1 <br />35.2-57.4 <br />32.7-35.2 <br />Silt Overburden <br />MW -6 <br />3098238 <br />1486747.45 <br />5239.68 <br />5237.64 <br />12/19/2012 <br />4 "/ SCH40 PVC <br />229.7 <br />209.4 -229.4 <br />205.5 -231.1 <br />203.0 -205.5 <br />Niobrara <br />MW -7 <br />3098804 <br />1484797.04 <br />5219.61 <br />5217.22 <br />12/15/2012 <br />4'Y SCH40 PVC <br />259.2 <br />238.8 -258.8 <br />236.1 -259.2 <br />231.2 -236.1 <br />Niobrara <br />Notes: 1- Coordinates are in Colorado State Plane North Grid NAD 83 and elevations are on NAD 88 datum. Top of well pads about 6 inches above land surface. <br />2- MW -5 through MW -7 installation date is date the well, filter pack and grout placement were installed in the borehole, but completion with concrete pad, <br />bollards and protective steel riser was conducted at a later date. <br />3- Well total depths for MW -1 through MW -4 measured by Golder 7/30/2010 from the top of the PVC well casing top; bls = below land surface. Borehole <br />and well construction logs were unavailable for MW -4. Information provided for MW -4 was obtained from a video survey of the well performed on July <br />30, 2010. MW -1 well casing likely extended sometime after construction based on differences in drilled depth based from borehole log and total depth <br />measurement made 7/30/2010; was reduced by 0.30 feet on 01/10/2013 to enable closing and securing the steel protective riser lid. <br />4- Screened interval is the depth interval of the nominal length of the screen pipe section, and not the actual measured length of the perforations provided <br />on the well construction diagrams. <br />I: \10 \81640A\ 0400\ GWCharWelllnstallFieldRep _Fnl- 28Apr14 \Tables \Table 1 Monitoring Well Construction Summary_Draft_02142014.x1sx <br />Golder <br />Associates <br />