My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2014-05-05_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:45 PM
Creation date
5/13/2014 9:51:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
HYDROLOGY
Doc Date
5/5/2014
Doc Name
Groundwater characterization report
From
Golder Associates
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2014 8 10381640A <br />Golder observed the installation and development of monitoring wells MW -5, MW -6 and MW -7 as part of <br />this field investigation. The monitoring wells were installed between December 1 and December 26, 2012. <br />Golder recorded soil and rock geological conditions and collected laboratory soil and rock samples during <br />the well borehole advancements. Lithological and well construction logs for the newly installed wells are <br />provided in Appendix C. Well construction details for all Site wells are summarized on Table 1. <br />Golder conducted hydraulic packer testing at three intervals during the advancement of MW -7 and rising <br />and falling head (slug) testing on monitoring well MW -5 after well installation and development. Monitoring <br />well installation, geological observations, and hydraulic testing were performed in general accordance <br />with the approved Groundwater Characterization Plan (Golder 2012) and modifications (Pottorff 2012). <br />The Groundwater Characterization Field Summary Report (Golder 2013) details the tasks performed <br />during the field investigation, monitoring well construction details, geological observations, and hydraulic <br />conductivity calculations and results. <br />3.2 Laboratory Testing of Solids <br />Whole rock sampling and laboratory testing were completed in accordance with the approved <br />Groundwater Characterization Plan (Golder 2012) and modifications (Pottorff 2012). Seven whole rock <br />samples were collected from the monitoring well borehole cuttings or core and submitted to ACZ <br />Laboratories, Inc. (ACZ) of Steamboat Springs, Colorado for SPLP and bulk chemical analysis (EPA <br />3050). Additionally, two samples of the CKD materials were collected from borehole CKD -1 and submitted <br />for laboratory testing as part of the 2012 investigation. The results are discussed in Sections 4.2.1 and <br />4.2.2 of this report. <br />3.3 Review of Water Supply Well Information <br />A review of publically available information was conducted for the previously identified nearby private <br />wells to ascertain if geologic or water chemistry data are available. This information was collected to <br />answer DRMS's concerns that nearby wells may be completed in the same aquifer and may become <br />impacted. This information search was conducted for both upgradient and downgradient well records from <br />the Colorado Division of Water Resources (DWR). The findings of this review are discussed in Section <br />4.4 of this report. <br />3.4 Groundwater Monitoring <br />Groundwater monitoring events were conducted in accordance with the SAP (Golder 2010). Golder <br />conducted one groundwater sampling event in September 2010, which has been followed by quarterly <br />sampling of the monitoring wells beginning in March 2011. In 2013, Golder collected quarterly <br />groundwater samples from the newly installed monitoring wells (MW -5, MW -6 and MW -7) in addition to <br />the previously installed monitoring wells (MW -1, MW -2, MW -3 and MW -4). Groundwater samples were <br />Golder <br />is \10 \81640a\ 0400 \gwcharwellinstallfieltlrep_fnl 30apr14n 0381840a gwcharrpt holcim boettcher_fnl 28apr14 with holcim edits.docx <br />GAssociates <br />
The URL can be used to link to this page
Your browser does not support the video tag.