My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2014-05-05_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:45 PM
Creation date
5/13/2014 9:51:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
HYDROLOGY
Doc Date
5/5/2014
Doc Name
Groundwater characterization report
From
Golder Associates
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2014 <br />7 <br />3.0 GROUNDWATER CHARACTERIZATION PROGRAM <br />10381640A <br />Golder developed the Groundwater Characterization Plan dated October 23, 2012 (Golder 2012), in <br />response to the June 25, 2012 DRMS letter. Based on our understanding of DRMS concerns, the primary <br />questions that need to be answered to ultimately achieve full release of reclamation liability include: <br />• Has groundwater been impacted by CKD disposal at the Site? <br />• If groundwater has been impacted by CKD, are remedial actions necessary? <br />The scope of work (SOW) outlined in the characterization plan were designed to address these <br />questions and included the following: <br />• Conduct a field investigation to include: 1) drilling and rock core sampling, 2) new <br />groundwater monitoring well construction, 3) collecting samples from the new and <br />existing monitoring wells, and 4) obtaining and evaluating additional information from <br />private wells in the vicinity of the Site, if available, <br />• Summarize the field investigation activities in a brief report, and <br />• Prepare a Characterization Report after four quarters of monitoring of the new wells has <br />been performed. The report was to define the extent of impacted groundwater and outline <br />proposed actions, if necessary, to minimize current and future impacts. <br />These tasks have been completed and this report summarizes activities that have occurred to date. <br />3.1 Hydrogeological Field Investigation <br />Golder conducted a drilling, well installation and hydraulic testing field program at the Site between <br />November 28, 2012 and March 5, 2013 in general accordance with the approved Groundwater <br />Characterization Plan (Golder 2012) and modifications (Pottorff 2012). The tasks performed in this field <br />program consisted of the following components: <br />■ Drilling; <br />• Geological Logging; <br />• Whole Rock Core Sampling; <br />• Packer Testing; <br />■ Well Installation and Development; and <br />■ Well Hydraulic Testing. <br />Golder observed the advancement of borehole CKD -1 through the CKD layer in the disposal area A2. The <br />borehole was advanced on December 28, 2012 to collect CKD samples for laboratory analysis. The <br />borehole log for CKD -1 is provided in Appendix C. <br />i110\81640a\ 0400\ gwchar+ ellinstallfieldrep _fnl- 30apr14\10381640a gwcharrpt _holcim- Uoettcher_fnl- 28apr14- with holcim edits.docx <br />Golder <br />Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.