Laserfiche WebLink
Mr. Peter Hays, DRMS <br />May 08, 2014 <br />the leak, the cause cannot be determined until equipment is able to access and expose <br />the pipe. When equipment is able to expose the pipe the line will be fixed accordingly at <br />the same time. The integrity of the length of the #1 Cutout Line will be checked and <br />repaired to prevent future releases. The #1 Cutout Line will not be used until repairs are <br />completed. <br />If you have any additional questions or concerns, please feel free to contact me at 720 - 942 -3480 or Bryce <br />Romig at 720 - 942 -3231. <br />Sincerely, <br />Amber Moran <br />Environmental Engineer II <br />Climax Molybdenum Company <br />Henderson Mill <br />CC (via email): <br />B. Romig, Climax <br />M. Hamarat, Climax <br />T. Haynes, Climax <br />S. Deely, Freeport- McMoRan <br />N. Hall, Freeport- McMoRan <br />L. Decker, Gallagher & Kennedy <br />Page 2 <br />