My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-12_REVISION - M2002114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002114
>
2014-05-12_REVISION - M2002114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:38 PM
Creation date
5/12/2014 4:16:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
REVISION
Doc Date
5/12/2014
Doc Name
Request for technical revision TR05
From
Oldcastle SW Group, Inc. dba United Companies of Mesa County
To
DRMS
Type & Sequence
TR5
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoiling <br />Topsoiling will be needed along the following areas: <br />— Portion of Pit 1. Topsoil has been placed along the lake perimeter in some areas but additional <br />topsoil will be needed to cover the 11.51 acres of wetland shelves and an additional 8.4 acres <br />around the lake. This is a total of 19.91 acres x 8 inches = 21,414 cy. <br />-Pit 2 is almost entirely topsoiled except for 6.4 acres around the lake in the dryland areas. This <br />is 6883 cy of topsoil at a depth of 8 inches. <br />-Pit 3 will get filled by water but the perimeter will require topsoil to 8" depth. This area is 2980 <br />ft perimeter x 50 feet width = 3.4 acres. The volume is 3679 cy. <br />-Pit 4 will get filled by water but the perimeter will require topsoil to 8" depth. This area is 5007 <br />ft perimeter x 50 feet width = 5.75 acres. The volume is 6181 cy. <br />- Additional area of overburden stockpile footprints, pit roads, and facility areas total an <br />additional 9.5 acres. The volume of topsoil required for this work is 10,217 cy. <br />Therefore, the total topsoiling volume needed to move and place on site is 48,374 cy. The cost <br />for this moving and placement is $1.40 per cy. <br />Topsoil Preparation <br />Ripping and/or discing of the topsoil will occur after placement. The total area is 44.96 acres. <br />Most of the remaining area of disturbance will be filled with water and will become lake surface. <br />The ripping /discing cost is estimated to be $200 per acre. <br />15 Road Pit May 14 L -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.