Laserfiche WebLink
4. Reclamation Timetable <br />The time for reclamation is shown below. Exhibit L: Reclamation Costs describes the worst case <br />bond scenario. <br />Table E -2 <br />Task # <br />Description <br />Time Needed <br />Months <br />1 <br />Prepare sediment pond and place berm <br />0.25 <br />along I -70 <br />2 <br />Strip topsoil from Pit Ito stockpile at <br />0.5 <br />northwest corner of Pit 1 <br />3 <br />Bring in portable crusher, screen plant, <br />0.25 <br />stackers, truck scale, and scale house. <br />4 <br />Mine Pit 1 <br />29.7 <br />5 <br />Reclaim Pit 1 and mine Pit 2 <br />30.0 <br />6 <br />Reclaim Pit 2 and mine Phases 1 -3 of <br />15.0 <br />Pit 3. Reclaim the previous phase as <br />each phase is being mined. <br />7 <br />Mine Phases 1 -4 of Pit 4 and reclaim <br />25.1 <br />the revious phase concurrently <br />8 <br />Mine Phases 4 -7 of Pit 3 and then <br />72.0 <br />topsoil around the graded lake. Fill <br />this lake. Then mine Phases 5 -10 of <br />Pit 4. Topsoil around this lake and <br />then fill the lake. <br />9 <br />Remove all facilities <br />0.5 <br />10 <br />Reseed and mulch wetland areas <br />0.25 <br />Total months <br />188.5 <br />Total years <br />15.7 <br />15 Road Pit May 14 E -4 <br />