My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-08_REVISION - C2010089
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-05-08_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:51 PM
Creation date
5/8/2014 2:45:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
5/8/2014
Doc Name
Cost Estimate (emailed)
From
Jim Stark
To
Mike Boulay
Type & Sequence
TR5
Email Name
MPB
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br />Task description: Demolish and Remove All Structures <br />Site: <br />New Horizon North Mine <br />Demolition Menu <br />Selection <br />PROJECT IDENTIFICATION <br />Task #: <br />95A <br />Date: <br />5/8/2014 <br />User: <br />JRS <br />UNIT COSTS <br />Permit Action: Technical Revision 5 <br />State: Colorado <br />County: Montrose <br />Agency or organization name <br />DRMS <br />Permit/Job #: C2010089 <br />Abbreviation: None <br />Filename: C089 -95A <br />Location adiustment: 96.90 % <br />Structure or Item <br />Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />Foreman's Office <br />20'x60'xl2' <br />Bldg. (MN) demo. /on- <br />14,400.00 <br />CF <br />$0.20 <br />$2,894.40 <br />site disposal in existing <br />pit or cut -Max. 10,000 <br />ft. haul <br />- Pad <br />20'x60'x6" <br />Demo. and on -site <br />1,200.00 <br />SF <br />$1.70 <br />$2,038.80 <br />disposal in existing pit, 6 <br />in. thick - Max. 10,000 <br />ft. haul <br />Cargo Container #1 <br />8'x20'x8' <br />Bldg. (SN) demo. /on- <br />1,280.00 <br />CF <br />$0.18 <br />$227.84 <br />site disposal in existing <br />pit or cut -Max. 10,000 <br />ft. haul <br />Cargo Container #2 <br />8'x20'x8' <br />Bldg. (SN) demo. /on- <br />1,280.00 <br />CF <br />$0.18 <br />$227.84 <br />site disposal in existing <br />pit or cut -Max. 10,000 <br />ft. haul <br />Cargo Container #3 <br />8'x20'x8' <br />Bldg. (SN) demo. /on- <br />1,280.00 <br />CF <br />$0.18 <br />$227.84 <br />site disposal in existing <br />pit or cut -Max. 10,000 <br />ft. haul <br />Cargo Container #4 <br />8'x20'x8' <br />Bldg. (SN) demo. /on- <br />1,280.00 <br />CF <br />$0.18 <br />$227.84 <br />site disposal in existing <br />pit or cut -Max. 10,000 <br />ft. haul <br />Power Lines <br />1,025 LF <br />Powerline or telephone <br />1,025.00 <br />LF <br />$2.60 <br />$2,662.95 <br />line, overhead, wood - <br />Single pole <br />Storage Yard Fence <br />630 LF <br />Fencing, chain link, <br />630.00 <br />LF <br />$2.41 <br />$1,518.30 <br />including posts and <br />fabric - to 6 ft. high <br />12,000 Gallon Fuel <br />2 @12,000 Gal <br />Comprehensive storage <br />2.00 <br />EA <br />$8,037.20 <br />$16,074.40 <br />Tanks <br />tank removal, non- <br />leaking - 9,000 to 12,000 <br />gal. tank <br />1,000 Gallon Fuel <br />1 @1,000 Gal <br />Comprehensive storage <br />1.00 <br />EA <br />$3,552.10 <br />$3,552.10 <br />Tank <br />tank removal, non- <br />leaking - 3,000 to 5,000 <br />gal. tank <br />PCS Clean-Up at Fuel <br />Assume 100 <br />Dispose of contaminated <br />100.00 <br />CY <br />$262.50 <br />$26,250.00 <br />Island <br />CY <br />soil at approved landfill <br />- Average <br />Culvert C -1 <br />18 "x50 LF <br />Pipe, corrugated metal <br />50.00 <br />LF <br />$2.39 <br />$119.50 <br />(CMP) - 18 in. diameter <br />pipe <br />
The URL can be used to link to this page
Your browser does not support the video tag.