My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-08_REVISION - C2010089
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-05-08_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:51 PM
Creation date
5/8/2014 2:45:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
5/8/2014
Doc Name
Cost Estimate (emailed)
From
Jim Stark
To
Mike Boulay
Type & Sequence
TR5
Email Name
MPB
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Technical Revision 5 Cost Summary <br />Permit Action: Technical <br />Site: New Horizon North Mine Revision 5 Permit/Job #: C2010089 <br />PROJECT IDENTIFICATION <br />Task #: OOC State: Colorado <br />Date: 5/8/2014 County: Montrose <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C089 -OOC <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />95A <br />95B <br />Demolish and Remove All Structures <br />DEMOLISH <br />1 <br />1 <br />480.00 <br />$67,639.97 <br />($141,405.20) <br />Structural Demolition <br />DEMOLISH <br />- 480.00 <br />SUBTOTALS: <br />0 <br />($73,765.23) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />($1,490.06) <br />1.05% <br />Total = <br />($774.53) <br />0.00 hrs <br />Total = <br />$0.00 <br />10.00% <br />Total = <br />($7,376.52) <br />TOTAL O & P = <br />($9,641.11) <br />CONTRACT AMOUNT (direct + O & P) = <br />($83,406.34) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />4.61% <br />3.58% <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = ($3,845.03) <br />($2,985.95) <br />Total = $0.00 <br />TOTAL INDIRECT COST = ($16,472.09) <br />TOTAL BOND AMOUNT (direct + indirect) = ($90,237.32) <br />
The URL can be used to link to this page
Your browser does not support the video tag.