Laserfiche WebLink
STAFF SUMMARY FORM FOR <br />CONSENT AGENDA ITEMS <br />Date: April 30, 2014 <br />Operator: Robins Construction, LLLP <br />Permit No.: M -2009 -053 <br />Operation: Robins Rock Pit <br />Permit Type: 110c <br />Specialist: Wallace N. Erickson <br />Action: Possible Violation of permit conditions and section 34- 32.5- 109(1) C.R.S. <br />Resolution: Robins Construction, LLLP (Operator), concedes to the violation of permit <br />conditions and section 34- 32.5- 109(1) C.R.S., for failing to first obtain a reclamation permit <br />from the Board or Office prior to engaging in a new operation; and to the Cease and Desist <br />Order, Corrective Actions, and Civil Penalties, provided herein, for the Robins Rock Pit, Permit <br />No. M- 2009 -053. <br />Chronology: <br />0 March 5, 2010 Permit No. M- 2009 -053 issued <br />• November 20, 2013 DRMS site inspection <br />• April 3, 2014 DRMS inspection report signed and mailed to Operator <br />0 April 16, 2014 RTB signed and mailed to Operator <br />Reason for Violation: The mining operation has affected approximately four acres outside of <br />the approved permit boundary, as described in the Division's inspection report generated from <br />the November 20, 2013, inspection of the Robins Rock Pit, Permit No. M- 2009 -053, signed April <br />3, 2014. <br />