My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-02_ENFORCEMENT - M2009053
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2009053
>
2014-05-02_ENFORCEMENT - M2009053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:43 PM
Creation date
5/6/2014 9:45:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009053
IBM Index Class Name
ENFORCEMENT
Doc Date
5/2/2014
Doc Name
Consent agenda summary form
From
DRMS
To
Robins Construction, LLLP
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />April 30, 2014 <br />Randy Robins <br />Robins Construction, LLLP <br />P.O. Box 212 <br />Antonito, CO 81120 <br />RE: Consent Agenda Summary Form, Robins Rock Pit, Permit No. M- 2009 -053 <br />Dear Mr. Robins: <br />�j <br />o ;�ON/W <br />?O <br />A possible violation at the Robins Rock Pit has been scheduled for consideration by the Mined <br />Land Reclamation Board (Board). As indicated in the Division's correspondence dated April 16, <br />2014, RE: Reason to Believe a Violation Exists, the formal Board hearing has been scheduled to <br />occur during the May 21— 22, 2014, Board meeting. <br />Please find enclosed the Staff Summary Form for Consent Agenda Items (consent form) for the <br />possible violation at the Robins Rock Pit. If you concede to the violation please affix your <br />notarized signature on the enclosed consent form and return the signed form, with original <br />signatures, to the Division no later than May 6, 2014. Upon receipt of the signed and notarized <br />consent form the item will be moved from the Board's agenda for enforcement hearings to <br />consent items and there will be no formal Board hearing regarding the possible violation. <br />However, if you wish to contest the possible violation or any of the conditions of the enclosed <br />consent form, please inform the Division at your earliest convenience and do not sign the <br />consent form. In the absence of a signed and notarized consent form the formal Board hearing <br />will proceed as scheduled for May 21— 22, 2014, <br />SZerZP'�� <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />Enclosure: Staff Summary Form for Consent Agenda Items <br />Ec w /enclosure: Randy Robins, Robins Construction, randv@)robinsconstruction.com <br />Scott Johnson, Summit Engineering, scott4622(@gmail.com <br />Russ Means, DRMS GJFO, russ.means state.co us <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />* ta7F' <br />
The URL can be used to link to this page
Your browser does not support the video tag.