My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-05-05_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:46 PM
Creation date
5/6/2014 9:33:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
5/5/2014
Doc Name
Reclamation Cost Estimate (Revised)
From
DRMS
To
Tamme Bishop
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No.77 Page 16 of 34 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />500.00 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />0.482 <br />Haul Time: 0.482 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />500.00 <br />-5.00 <br />5.00 <br />0.00 <br />2938 <br />0.195 <br />Return Time: 0.195 <br />Total Truck Cycle Time: 3.257 <br />Loading Tool unit <br />Production 391.61 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />202.00 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks <br />2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 167.66 <br />Adjusted single truck/loader team production: 167.66 <br />Adjusted multiple truck/loader team production: 167.66 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.068 /LCY <br />minutes <br />minutes <br />325.03 LCY/Hour <br />167.66 LCY/Hour <br />1 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 50.03 Hours <br />Total job cost: $8,958.53 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.