My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-05-05_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:46 PM
Creation date
5/6/2014 9:33:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
5/5/2014
Doc Name
Reclamation Cost Estimate (Revised)
From
DRMS
To
Tamme Bishop
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 <br />Truck <br />Technical Revision No.77 Page 15 of 34 <br />Truck Bed (volume) Basis: <br />Altitude Adj : <br />1.000 <br />Struck Volume: <br />10.00 <br />LCY <br />Heaped Volume: <br />12.00 <br />LCY <br />Average Volume: <br />11.00 <br />LCY <br />Adjusted Volume: <br />12.00 <br />LCY <br />Final Truck <br />Volume <br />Based on Number of Loader Passes: 10.97 LCY <br />Loading Tool Capacity <br />1 0.000 <br />1 (Cat HB) <br />Bucket Size Class: NA <br />Rated Capacity: 4.300 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90 %) 0.850 <br />Adjusted Capacity: 3.655 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6300 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.500 minutes <br />3 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj : <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.500 minutes <br />3 passes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Bank or broken material 0.04 <br />0.040 <br />(Cat HB) <br />Stockpile: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />I Inconsistent operation 0.04 <br />1 0.040 <br />1 (Cat HB) <br />Dump Target: <br />I Nominal target 0.00 <br />1 0.000 <br />1 (Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 1.180 <br />Truck Maneuver and Dump Time: 0.90 <br />Truck Travel (Haul & Return) Time: <br />enetration 5.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />0.040 minutes <br />0.540 minutes <br />1.180 minutes <br />Minutes Adjusted for site altitude: 0.500 Minutes <br />Minutes Adjusted for site altitude: 1.180 Minutes <br />Minutes Adjusted for site altitude: 0.900 Minutes <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.