Laserfiche WebLink
5/5/2014 State.co.us Executive Branch Mail -RE: Bowie No. 2 Mine C1996083 MR150 - Adequacy Review <br />P 303.866,3567 x 8111 I F303.832.8106 <br />1313 Sherman Street, Room 215, Denver, CO 80203 <br />Susan- <br />We have been evaluating and discussing this request. So you know, this strain of cutthroat trout is listed under <br />the Endangered Species Act, and given the federal nexus a with a Army Corps permit a Section 7 Consultation <br />with the USFWS maybe required. <br />Can you send us the location of these structures, so we determine where in the watershed the impacts to <br />cutthroats may occur. In addition, can you provide and estimate of how long in stream construction activities <br />would occur during between June 1 and June 15? <br />Thanks, <br />Brian <br />On Mon, Apr 28, 2014 at 8:18 AM, Burgmaier - DNR, Susan <susan.burgmaier@state.co.us> wrote: <br />Hello Brian - in the email message below, Bowie Resources, LLC is asking whether there is any flexibility in <br />the June 1 - September 1 dates when in- stream construction is not allowed during spawning. Will you please <br />review their request and let me know if it would be possible to allow construction as late as June 15th? <br />Susan L. Burgmaier <br />Coat Regulatory Program <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &viev�-- pt &search =i nbox&th= 145ccf943e5fd3ad &si ml= 145ccf943e5fd3ad 2/5 <br />