Laserfiche WebLink
April 23, 2014 C- 1981- 025/North Thompson Creek Mine BFB <br />hydrological balance, <br />Abatement 4: 1 <br />Abatement Due Date: 5/16/2014 <br />Abatement Due Extended Date: <br />Abatement Description: Submit a complete Technical Revision with a spillway design for Pond <br />P9 in compliance with Rules 4.05.6(4) and 4.05.9(2). <br />Abatement 4: 2 <br />Abatement Due Date: 6/20/2014 <br />Abatement Due Extended Date: <br />Abatement Description: Re- construct the spillways for Pond P9 to ensure the primary and <br />emergency spillways are in compliance with the approved revision and Rules 4.05.6(4) and 4.05.9(2). <br />PHOTOGRAPHS <br />Photo 3 — Pipe From T2 Needs Cleaning Photo 4 — P9 Discharge Into Emergency Spillway <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 4 of 6 <br />