My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-30_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-04-30_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:35 PM
Creation date
5/1/2014 7:27:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/30/2014
Doc Name
4th Adequacy Review Letter
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
William A. Bear <br />Page 7 of 8 <br />April 30, 2014 <br />11. DRMS: Once the material balance has been finalized, prior to approval of TR -77, the <br />reclamation cost estimate will likely need to be updated to reflect the final material <br />handling plan (material volumes, stockpile locations, and haul distances). <br />BRL: Comment noted. <br />DRMS 4130114: The reclamation cost estimate has been revised and is being transmitted to <br />BRL under separate cover. The revised estimate results in a reclamation liability increase of <br />$107,857.68. <br />New DRMS 4130114 Items: <br />12. BRL has proposed to supplement available cover material for Gob Pile #2 reclamation with <br />material excavated from three proposed borrow areas. In addition to the information on the <br />material excavation volume that BRL has provided, the Division will need the following <br />information for the borrow areas: <br />a. A topsoil salvage, storage, and redistribution plan, in accordance with Rules 2.05.3(5), <br />2.05.4(2)(d) and 4.06.4(2); <br />b. A regrading plan in accordance with Rules 4.14.1 and 4.14.2; <br />c. A revegetation plan in accordance with Rule 4.15; <br />d. A sediment control plan in accordance with Rules 2.05.3.(4), 2.05.6(3), 4.05.1, and <br />4.05.2; <br />e. Revised map(s) in accordance with Rule 2.10.3, clearly indicating the areas proposed <br />for disturbance; and <br />f. A reclamation plan and cost estimate in accordance with Rule 2.05.4. <br />g. A commitment from BRL that materials excavated from any borrow area will be direct <br />hauled for the purpose of covering refuse material, and will not be incorporated into <br />the refuse material, such as for drying purposes. <br />The Division will place a stipulation on its proposed decision for TR -77 requiring that a technical <br />revision to address the above requirements be submitted within 45 days of issuance of the TR- <br />77 decision. <br />13. BRL has provided a revised coverfill material balance based on an in field survey conducted <br />April 09, 2014. The coverfill volume reported to be in stockpile were used to populate <br />Appendices A for Volumes IX and XI. The stockpiled coverfill in place at the time of the survey, <br />
The URL can be used to link to this page
Your browser does not support the video tag.