My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-30_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-04-30_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:35 PM
Creation date
5/1/2014 7:27:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/30/2014
Doc Name
4th Adequacy Review Letter
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
William A. Bear <br />Page 6 of 8 <br />April 30, 2014 <br />8. DRMS: Pages 2 and 4 of Volume XI have been revised to change the available topsoil <br />salvage depth from 2.4' to 1.0 -1.5', and the replacement depth from 2.4' to 1.0'. Please <br />explain why the available salvage depths and replacement depths are being changed, and <br />demonstrate that this change is consistent with the requirements of Rules 4.06.2(a) and <br />4.06.2(b). (This was Item 15 of the Division's January 16, 2014 adequacy review letter for <br />TR -84. ) <br />BRL: The topsoil salvage depth should not have been changed. Please see revised pages 2 <br />& 4 for Volume XI. Please see response in 6b for explanation of the change in replacement <br />depth. <br />DRMS 4130114: Please refer to our comments for Item 6.b., above. <br />9. DRMS: BRL has provided a material balance sheet as new Appendix A to Volume XI. The <br />volumes proposed for cover fill and topsoil replacement may require revision depending on <br />the outcome of Item 15, above. (This was Item 21 of the Division's January 16, 2014 <br />adequacy review letter for TR -84, and the reference would be to Item 8 of this document.) <br />BRL: The topsoil salvage depth has been revised to 2.4 feet. Please see revised Volume XI, <br />Appendix A. Many changes have been made to Appendix A to reflect documentation <br />gathered during the in -field survey. Please see revised Appendix A for details and material <br />balance. <br />DRMS 4130114: Response accepted. <br />10. Map 32 — Topsoil Distribution Plan - Please explain why the replacement depth for the F1 <br />topsoil stockpile distribution area is being changed, and demonstrate that this change is <br />consistent with the requirements of Rule 4.06.4(2)(a). (This was Item 41 of the Division's <br />January 16, 2014 adequacy review letter for TR -84.) <br />BRL: Please see response provided in Adequacy Item number 6(b). <br />DRMS 4130114: Please refer to our comments on Item 6.b., above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.