Laserfiche WebLink
ATTACHMENT A <br />AMEC - 2014 CQA Field Staff Schedule MLE2 <br />R-011 M, <br />Name <br />April 13 <br />A ril14 <br />April 15 <br />A ril16 <br />Aril 17 <br />April 18 <br />A ril19 <br />Tim Burkhard <br />PR <br />PR <br />PR <br />PR <br />Steve Rice <br />UG <br />UG <br />UG <br />UG <br />Ben Melly <br />ST <br />ST <br />ST <br />ST <br />Robert Redd <br />UG <br />UG <br />UG <br />UG <br />Chad Schreiner <br />ST <br />Eric Lorenson <br />ST <br />ST <br />ST <br />ST <br />ST <br />Razi Mollo <br />LT <br />LT <br />LT <br />LT <br />LT <br />Randy Johnson <br />ST <br />ST <br />Chris Buckman <br />GP <br />GP <br />Matt Hartz <br />GP <br />GP <br />Mike Nelson <br />PM <br />_ <br />Andrea Meduna <br />_ <br />SE <br />LEGEND: <br />PL = Project Lead <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= FieldlLaboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />Page 4 of 6 MLE2 NVE 19 April 2014. doe <br />