Laserfiche WebLink
W <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remediation and confirmatory <br />drilling; Production drilling and blasting: and Testing and sampling of clay from Dump 1 and concrete from UG U6274; <br />and Geophysical surveying. <br />Ii) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density relationships, gradations, material classification, identifications, and field material sampling were <br />performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Test sample TS -58 for potential clay source from Dump 1 <br />Cast concrete cylinders for strength testing from UG #U6274. <br />Note: Samples labeled with the suffix "R" are samples of Record / QA samples; those without are QC samples. <br />General Project Items <br />Meetings and Discussions: The Contractor Meeting occurred on April 16, 2014 with CC &V Projects, AMEC, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, AMEC, and Ames. <br />Miscellaneous: <br />Drain cover fill processing continued. <br />Rip rap processing continued. <br />Geophysical surveying continued in the PSSA. <br />Deliveries: None <br />Submitted by: Eric Lorenson Date: 04 -22 -2014 <br />Reviewed By: -' Date: 04 -22 -2014 <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 719.689.2986 <br />Approved By: _ <br />CC &V Projects <br />36� - <br />Pave 3 of 6 MLE2 WE 19 April 2014.doc <br />