My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-04-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:30 PM
Creation date
4/29/2014 3:45:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/28/2014
Doc Name
Weekly construction quality assurance report week ending 4/19/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remediation and confirmatory <br />drilling; Production drilling and blasting: and Testing and sampling of clay from Dump 1 and concrete from UG U6274; <br />and Geophysical surveying. <br />Ii) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density relationships, gradations, material classification, identifications, and field material sampling were <br />performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Test sample TS -58 for potential clay source from Dump 1 <br />Cast concrete cylinders for strength testing from UG #U6274. <br />Note: Samples labeled with the suffix "R" are samples of Record / QA samples; those without are QC samples. <br />General Project Items <br />Meetings and Discussions: The Contractor Meeting occurred on April 16, 2014 with CC &V Projects, AMEC, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, AMEC, and Ames. <br />Miscellaneous: <br />Drain cover fill processing continued. <br />Rip rap processing continued. <br />Geophysical surveying continued in the PSSA. <br />Deliveries: None <br />Submitted by: Eric Lorenson Date: 04 -22 -2014 <br />Reviewed By: -' Date: 04 -22 -2014 <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 719.689.2986 <br />Approved By: _ <br />CC &V Projects <br />36� - <br />Pave 3 of 6 MLE2 WE 19 April 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.