Laserfiche WebLink
Natural Soda, Inc. <br />Disturbance and Well Abandonment Information <br />NSI 8H, 9H, & 14H Production Well Pads and Road Construction Acreage <br />Well Pad <br />Length <br />Width <br />ft ' <br />Acreage <br />Comment <br />8 & 9 H <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />2.] ac of existing 3A4H & IA-5HR to b, <br />14H <br />nal <br />na <br />143,748.0 <br />3.30 <br />per DRG <br />I Comment <br />Proposed Road <br />length <br />I Width <br />ftz <br />Acreage <br />Comment <br />8&9H <br />0.01 <br />0.01 <br />0.01 <br />0.001 <br />Existing roads to be used <br />141-1 <br />53.01 <br />15.01 <br />795.01 <br />0.02 <br />TOTAL DISTURBANCE (ac.) 4.01 <br />NSI WSW -3 & WSW-4 Water Supply Well Pads and Road Construction Acreage <br />Well Pad <br />I Length <br />I Width <br />It <br />Acreage <br />Comment <br />WSW-31 <br />200.01 <br />150.0 <br />30,000.01 <br />0.69 <br />0.69 <br />WSW-41 <br />200.01 <br />150.01 <br />30,000.01 <br />0.69 <br />I Acreage <br />I Comment <br />Proposed Road <br />I Length <br />I Width <br />ft' <br />I Acreage <br />Comment <br />WSW-31 <br />134.31 <br />15.01 <br />2,014.0 <br />0.05 <br />14201 <br />�--WSW-41 <br />20.01 <br />15.01 <br />300.01 <br />0.01 <br />TOTAL DISTURBANCE (ac.) 1.43 <br />NSI DS -6 Core /Monitor Well Pad and Road Construction Acreage <br />Well Pad <br />I Length <br />I Width <br />I ft' <br />I Acreage <br />Comment <br />DS -6 (Phase 3)1 <br />200.01 <br />150.01 <br />30,000.01 <br />0.69 <br />0.69 <br />9H -1 <br />New Road <br />I Length <br />I Width <br />I ft' <br />I Acreage <br />I Comment <br />DS -6 (Phase 3)1 <br />61.01 <br />15.01 <br />915.01 <br />0.02 <br />14H-RI <br />TOTAL DISTURBANCE (ac.) 0.71 <br />2014 RDP WELL PAD DISTURBANCE (Phase 1) <br />Well <br />Well Pad <br />Length <br />Width <br />ft= <br />Acreage <br />Comment <br />A (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />9H -1 <br />B (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />6.969 <br />C (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />14H-RI <br />D (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />14201 <br />E (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />F (Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />6.5 <br />G (Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />C (Phase 1) <br />H (Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />6.5 <br />1 (Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />F (Phase 1) <br />J (Phase 1) <br />0.0 <br />0.0 <br />0.0 <br />0.00 <br />on existing 10H -13H pad <br />K (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />1 (Phase 1) <br />L (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />6.5 <br />M (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />L (Phase 1) <br />DS -7 (Phase 1) <br />0.0 <br />0.0 <br />0.0 <br />0.00 <br />on existing 2A -2V pad <br />TOTAL PHASE 1 WELL PAD DISTURBANCE (ac.) 8.26 <br />Well P&A Information <br />Well <br />Hole Depth <br />(ft.) <br />*bridgeplug <br />Hole Dia <br />Comment <br />8H -1 <br />*2110 <br />6.969 <br />2012 <br />8H -R <br />*2110 <br />6.969 <br />9H -1 <br />*2110 <br />6.969 <br />94 -1M <br />9H -R <br />*2110 <br />6.969 <br />2013 <br />14H -I <br />1 *21101 <br />6.969 <br />14H-RI <br />*21101 <br />6.969 <br />WSW-31 <br />14201 <br />6.969 <br />WSW-41 <br />14311 <br />6.969 <br />DS -6 (Phase 3) 18821 4 <br />A (Phase 1) <br />1844 <br />6.5 <br />B (Phase 1) <br />1879 <br />6.5 <br />C (Phase 1) <br />1898 <br />6.5 <br />D (Phase 1) <br />1949 <br />6.5 <br />E (Phase 1) <br />1967 <br />6.5 <br />F (Phase 1) <br />1933 <br />6.5 <br />G (Phase 1)l <br />2012 <br />6.5 <br />H (Phase 1) <br />1983 <br />6.5 <br />1 (Phase 1) <br />1986 <br />6.5 <br />1 (Phase 1) <br />2038 <br />6.5 <br />K (Phase 1) <br />1963 <br />6.5 <br />L (Phase 1) <br />1901 <br />6.5 <br />M (Phase 1) <br />1917 <br />6.5 <br />DS-7 (Phase 1)1 <br />18971 <br />4 <br />N (Phase 2) <br />1859 <br />6.5 <br />0 (Phase 2) <br />1807 <br />6.5 <br />P (Phase 2) <br />1817 <br />6.5 <br />Q (Phase 2) <br />1836 <br />6.5 <br />R (Phase 2) <br />1835 <br />6.5 <br />S (Phase 2) <br />1744 <br />6.5 <br />T (Phase 2) <br />1739 <br />6.5 <br />U (Phase 2) <br />1694 <br />6.5 <br />Note the following wells, that are indicated on the 03/12/13 <br />CIRCES document, have been P&A'ed: <br />Well <br />Year of P &A <br />Comment <br />4A -1V <br />2012 <br />4A -5M <br />2012 <br />88 -1 <br />2013 <br />90 -2 <br />2013 <br />94 -1M <br />2012 <br />1 -3A <br />2013 <br />loft <br />Daub & Associates, Inc. 0 NSI 2014 Drilling Program Proposed Pad & Road Construction Acerage <br />