Laserfiche WebLink
Volume IX - GOB PILE #2 <br />APPENDIX A <br />Coal Mine Waste Disposal Area <br />Salvage Volumes <br />Area <br />*Topsoil <br />Topsoil <br />Acres <br />Depth Ft. <br />CY <br />Coverfill Pile <br />2.3 <br />1.2 <br />4,453 <br />Initial 50 Foot Bench <br />3.9 <br />1.2 <br />7,550 <br />Second 50 Foot Bench <br />7.7 <br />1.2 <br />14,907 <br />Third 50 Foot Bench <br />5.8 <br />1.2 <br />11,229 <br />Fourth 50 Foot Bench <br />2.9 <br />1.2 <br />5,614 <br />Top of Pile <br />2.3 <br />1.21 <br />4,453 <br />Gob Pile #4 <br />7.4 <br />0.581 <br />6,924 <br />Gob Pile #1 <br />2.7 <br />0.5 <br />2,178 <br />Gob #2 West Expansion <br />1.8 <br />1.2 <br />3,485 <br />Gob #2 Expansion -TR76 <br />1 6.1 <br />1.2 <br />11,810 <br />(Fill in Draw Between Pile #2 and #4) <br />Tota Is <br />42.90 <br />72,603 <br />(Estimated value, not actually <br />in stockpile) <br />Reclamation <br />Volumes <br />Area <br />Topsoil <br />Topsoil <br />From <br />Cover (Regd) <br />Acres <br />Depth Ft. <br />CY <br />Stockpile <br />CY <br />Reclamation Areas <br />Gob #4 (West Half) <br />4.83 <br />0.50 <br />3,896 <br />3,896 <br />27,273 <br />First Bench Pile #2 <br />4.41 <br />0.50 <br />3,557 <br />3,557 <br />24,902 <br />Second Bench Pile #2 <br />5.10 <br />0.50 <br />4,114 <br />4,114 <br />28,798 <br />Third Bench Pile #2 <br />7.45 <br />0.50 <br />6,010 <br />6,010 <br />42,068 <br />Fourth Bench Pile #2 <br />8.02 <br />0.501 <br />6,469 <br />6,469 <br />45,286 <br />Fifith Bench Pile #2 <br />8.28 <br />0.50 <br />6,679 <br />6,679 <br />46,754 <br />Top of Pile Pile #2 <br />7.39 <br />0.50 <br />5,961 <br />5,961 <br />41,729 <br />Coverfill <br />2.30 <br />0.50 <br />1,855 <br />1,855 <br />n/a <br />gob Pile #1 <br />1.12 <br />0.50 <br />903 <br />903 <br />6,324 <br />Total: <br />48.90 <br />39,446 <br />39,446 <br />263,135 <br />Coverfill Material Balance: <br />Coverfill currently in -Place <br />55,055 <br />Coverfill in stockpile, available for reclamation <br />92,937 <br />Coverfill to be borrowed to complete reclamation <br />115,143 <br />Total: <br />263,135 <br />In -Place <br />Required <br />Amount <br />CY <br />Coverfill In- Place: <br />Bench #1 <br />24,902 <br />Gob #2 Benches 2/3/4 <br />23,829 <br />Gob Pile #1 <br />6,324 <br />Subtotal: <br />55,055 <br />Coverfill already in place (3.5' <br />depth) <br />Coverfill Available for reclamation: <br />COVERFILL PILE -West <br />35,000 <br />In Stockpile <br />Coverfill Pile -East <br />44,537 <br />In Stockpile <br />Top of Gob Pile #4 <br />13,400 <br />Subtotal: <br />92,937 <br />Coverfill Necessary to complete reclamation: <br />TR -79 Excess Coverfill (to be salvaged) <br />14,000 <br />Calculated /Estimate <br />From Gob Pile #3 Area (to be salvaged) <br />58,943 <br />Estimate <br />Adjacent Borrow area #1 - Gob Pile #2 area <br />7,200 <br />Adjacent Borrow area #2 - Gob Pile #2 area <br />30,000 <br />Adjacent Borrow area #3 - Gob Pile #2 area <br />5,000 <br />Tota I: <br />115,143 <br />Topsoil <br />In- Place; <br />Volume <br />Salvaged <br />CY <br />TOPSOIL PILE D <br />4,524 <br />In -Place <br />TOPSOIL PILE E <br />37,948 <br />In -Place <br />Tota I: <br />42472 <br />NOTES: <br />* UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER TO MATCH QUAN77-TYCALCULATED <br />VALUES ARE ES77MATED AND LIKEL YDIFFERENT FROM IN -FIELD CONDITIONS <br />TR -77 App. A -1 04/14 <br />