Laserfiche WebLink
VOLUME XI - GOB PILE #3 <br />Appendix A <br />Coal Mine Waste Disposal Area <br />Salvage Volumes <br />Area <br />*Topsoil <br />Topsoil <br />Acres <br />Depth Ft. <br />CY <br />Coverfill Pile -West <br />3.3 <br />2.4 <br />12,739 <br />Coverfill Pile -East <br />1.0 <br />2.4 <br />3,678 <br />Coal Mine Waste Pile <br />13.6 <br />2.4 <br />52,466 <br />Totals <br />17.79 <br />68,883 <br />Reclamation Volumes <br />Area <br />Topsoil <br />Topsoil <br />From <br />Cover (Req'd) <br />Total <br />Acres <br />Depth Ft. <br />CY <br />Stockpile <br />CY <br />(Req'd) <br />Initial 50 Foot Bench <br />5.2 <br />1.5 <br />12,681 <br />12,681 <br />21,135 <br />Second 50 Foot Bench <br />10.8 <br />1.5 <br />26,112 <br />26,112 <br />43,520 <br />Coverfill Pile <br />1.0 <br />1.5 <br />2,299 <br />2,299 <br />3,832 <br />Totals <br />16.98 <br />41,092 <br />41,092 <br />68,486 <br />109,578 <br />Coverfill Material Balance: <br />Coverfill in stockpile, available for <br />reclamation: <br />52,564 <br />Coverfill to be salvaged to complete <br />reclamation: <br />15,922 <br />Total: <br />68,486 <br />In- Place; <br />In- Place; <br />Volume Salvaged <br />TOTAL: <br />CY <br />CY <br />Coverfill Available for reclamation: <br />COVERFILL PILE (East) <br />24,140 <br />52,564 <br />Cover <br />COVERFILL PILE (West, In Gob Footprint) <br />28,424 <br />Coverfill necessary to complete reclamation, Gob Pile #2 <br />and Gob Pile <br />#3: <br />Coverfill necessary for gob pile #3, <br />15,922 <br />Coverfill necessary for gob pile #2 (see volume ix, App. A) <br />58,943 <br />Subtotal: <br />74,865 <br />* * ** <br />TOTAL Topsoil <br />(In -place and <br />to be salvaged <br />CY <br />TOPSOIL PILES, (In Place, From UTQ * ** <br />52,865 <br />41,558 <br />Topsoil <br />TOPSOIL PILES, (Newly Salvaged) ** <br />35,460 <br />To be salyaoed.• <br />6,098 <br />In footprint of West Coverfill Pile (3.78 Ac.) <br />NOTES.- <br />* UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER TO MATCH QUANTITY CALCULATED <br />** 6,500 CYADDED TO PREVIOUS TOTAL OF 28,424 CY based on 0410912014 in -field survey <br />***TOPSOIL TO BE USED FOR RECLAMATION AT UNIT TRAIN LOADOUT, NOT GOB PILE #3 (see VoiumeXlFigure 1 for details) <br />* * ** AMOUNT EQUATES TO SALVAGE DEPTH OF 15.0' IN FOOTPRINT OF GOB PILE #3 WHERE WEST COVERFILL <br />PILE IS CURRENTLY LOCATED -- IF NECESSARY, SALVAGE DEPTH COULD BE INCREASED TO PROVIDE ADDITIONAL <br />COVERFILL FOR RECLAMATION OF GOB PILES 2 -4. <br />TR -77 App. A 04/14 <br />