Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5929 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />603.04 LCY/hr <br />603.04 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.339/LCY <br />Total job time: <br />Total job cost: <br />23.54 Hours <br />54,813.23 <br />Page 6 of 10 <br />CIRCES Cost Estimating Software <br />