Laserfiche WebLink
Task description: Replace T <br />Site: Foidel Creek Mine <br />BULLDOZER WORK <br />on Drill Pads and Access Road <br />Permit Action: MR276 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 4/16/2014 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />$104.03 <br />Permit/Job #: C1982056 <br />Abbreviation: None <br />Filename: C056 -003 <br />Total unit Cost/Hour: $204.45 <br />Total Fleet Cost/Hour: $204.45 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,197 <br />Swell factor: 1.000 <br />Loose volume: 14.197 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />75 feet <br />1,017.1 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />6,700 feet <br />2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 <br />(AB.AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$63.00 <br />NA <br />Operating Cost/Hour: <br />$104.03 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $204.45 <br />Total Fleet Cost/Hour: $204.45 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,197 <br />Swell factor: 1.000 <br />Loose volume: 14.197 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />75 feet <br />1,017.1 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />6,700 feet <br />2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 <br />(AB.AVG.) <br />Material consistency: 1.100 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />Visibility: 1.000 <br />(AVG.) <br />