Laserfiche WebLink
James Stover <br />Page 2 of 2 <br />April 15, 2014 <br />Part 1, Section 3.A. (page 6) of the Division's April 18, 1995 Guideline Regarding <br />Selected Coal Mine Bond Release Issues states that sediment ponds and related <br />collection and diversion ditches should be reclaimed promptly upon approval of Phase <br />II bond release. Rule 4.05.3(6) requires that all temporary channels for the conveyance <br />of overland flow be removed when no longer needed. Accordingly, the Division will <br />require C.B. Minerals Company, LLC to either remove the remaining sediment control <br />structures, or submit a revision for their permanent retention. Unless a revision to <br />retain the structures is approved, reclamation of the sediment control structures must <br />be completed by September 30, 2014. <br />2. Please verify that the information in Section 2.2 - Identification of Interests of the <br />permit application package is current, including permittee ownership and control <br />information, surface and mineral ownership, and permittee compliance information. If <br />the information is outdated, please submit a minor revision to update the information. <br />Please respond to our concerns with these issues by letter or revision application(s) no later <br />than May 30, 2014. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />Enclosure <br />