Laserfiche WebLink
April 8, 2014 C- 1981 -033 /Bear Mine SLB <br />ROADS — Rule 4.03 11 Construction 4.03.1(3)/4.03.2(3)❑ Drainage 4.03.1(4)/4.03.2(4)11 Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) [1 Reclamation 4.03.1(7)/4.03.2(7): <br />Brush is beginning to crowd the access road, but it still remains passable by vehicle. The bridge providing <br />access over the North Fork continues to deteriorate; decking near the river banks is rotting out and the abutments <br />on both ends are eroding away from the bridge and into the river. <br />REVEGETATION — Rule 4.15 ❑ Vegetative Cover; Timing: <br />Vegetation was beginning to green up and emerge in the reclaimed areas. Weeds were not apparent at this <br />stage in the growing season. <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />PHOTOGRAPHS <br />Portal slope <br />Number of Partial Inspection this Fiscal Year: 10 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 4 <br />