April 9, 2014 C- 1996 -083 /Bowie No. 2 Mine SLB <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA—Not Applicable <br />Y - Air Resource Protection <br />R - Roads <br />N - Availability of Records <br />N - Reclamation Success <br />N - Backfill & Grading <br />N - Revegetation <br />R - Excess Spoil and Dev. Waste <br />N - Subsidence <br />N - Explosives <br />N - Slides and Other Damage <br />N - Fish & Wildlife <br />N - Support Facilities On -site <br />R - Hydrologic Balance <br />N - Signs and Markers <br />Y - Gen. Compliance With Mine Plan <br />NA - Support Facilities Not On -site <br />R - Other <br />NA - Special Categories Of Mining <br />R - Processing Waste <br />N - Topsoil <br />COMMENTS <br />This was a partial inspection of the Bowie No. 2 Mine conducted by Susan Burgmaier and Marcia Talvitie of <br />DRMS. Bill Bear of Bowie Resources, LLC (BRL) was present during the inspection. Also present were Tamme <br />Bishop (JE Stover & Associates, Inc) and Mike Berry (Huddleston -Berry Engineering and Testing), both <br />consultants for BRL. Tamme Bishop arranged an on -site meeting with Mike Berry to tour the refuse areas and <br />discuss pending revisions. After the refuse areas were inspected, the Pitkin Mesa pipeline relocation project and <br />the upper portion of the West Fork of Terror Creek were briefly inspected. <br />Weather conditions at the time of the inspection were clear and sunny, warming to the 60s by the close of the <br />inspection. Ground conditions were dry at lower elevations; upper elevations around upper Terror Creek were still <br />covered with about 1 -2' of snow. <br />The longwall miner was being moved from the B 14 panel to B 15. Coal refuse was being hauled to Gob Pile 43. <br />AIR RESOURCE PROTECTION— Rule 4.17: <br />Fugitive dust emissions on the gob piles and roadways were minimal. No watering equipment was observed <br />during the inspection, but the roadways and gob material being worked were fairly wet. <br />HYDROLOGIC BALANCE - Rule 4.05 11 Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Ponds B, C, D, and F all held water. Pond C was being pumped to the wash plant. <br />The operator indicted that well G3 -7 was abandoned sometime in the past year. The Division did not receive the <br />abandonment reports required by Rule 4.73(3) for G3 -1 through G3 -7, all of which appear (Map 9) to have been <br />located in the refuse area footprint. BRL should submit the required reports within 15 days of this inspection <br />report issuance. <br />Number of Partial Inspection this Fiscal Year: 14 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 2 of 14 <br />