My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-08_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2014-04-08_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:05 PM
Creation date
4/10/2014 11:25:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
4/8/2014
Doc Name
Drillilng Activity TR35
From
Daub & Associates, Inc.
To
DRMS
Type & Sequence
TR35
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda, Inc. <br />Disturbance and Well Abandonment Information <br />NSI 8H, 9H, & 14H Production Well Pads and Road Construction Acreage <br />Well Pad <br />Length <br />Width <br />ft 2 <br />Acreage <br />Comment <br />8&9H <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />Existing 3A -4H to be used <br />14H <br />nal <br />na <br />143,748.0 <br />3.30 <br />per DRG <br />I Comment <br />Proposed Road <br />Length <br />Width <br />ft2 <br />Acreage <br />I Comment <br />8&9H <br />0.01 <br />0.01 <br />0.01 <br />0.001 <br />Existing roads to be used <br />141-1 <br />53.01 <br />15.01 <br />795.01 <br />0.02 <br />200.01 <br />TOTAL DISTURBANCE (ac.) 4.01 <br />NSI WSW -3 & WSW-4 Water Supply Weil Pads and Road Construction Acreage <br />Well Pad <br />I Length <br />I Width <br />ft2 <br />I Acreage <br />I Comment <br />WSW-31 <br />200.01 <br />150.01 <br />30,000.01 <br />0.69 <br />B(Phase 1) <br />WSW-41 <br />200.01 <br />150.01 <br />30,000.01 <br />0.69 <br />1 Acreage <br />I Comment <br />Proposed Road <br />I Length <br />I Width <br />I ft2 <br />I Acreage <br />I Comment <br />WSW-31 <br />134.31 <br />15.01 <br />2,014.01 <br />0.05 <br />200.0 <br />WSW-41 <br />20.01 <br />15.01 <br />300.01 <br />0.01 <br />200.01 <br />TOTAL DISTURBANCE (ac.) 1.43 <br />NSI DS -6 Core /Monitor Well Pad and Road Construction Acreage <br />Well Pad <br />I Length <br />I Width <br />1 ft2 <br />1 Acreage <br />I Comment <br />DS-6 (Phase 3)1 <br />200.01 <br />150.01 <br />30,000.01 <br />0.69 <br />B(Phase 1) <br />200.0 <br />New Road <br />I Length <br />I Width <br />1 ft2 <br />1 Acreage <br />I Comment <br />DS -6 (Phase 3)1 <br />61.01 <br />15.01 <br />915.01 <br />0.02 <br />200.0 <br />TOTAL DISTURBANCE (ac.) 0.71 <br />2014 RDP WELL PAD DISTURBANCE (Phase 11 <br />Well Pad <br />Length <br />Width <br />ft 2 <br />Acreage <br />Comment <br />A(Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />6.969 <br />B(Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />91-1-11 <br />C(Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />6.969 <br />D (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />E(Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />14311 <br />F(Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />A (Phase 1) <br />G (Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />6.5 <br />H (Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />D (Phase 1) <br />I(Phase 1) <br />200.01 <br />150.0 <br />30,000.0 <br />0.69 <br />6.5 <br />1 (Phase 1) <br />0.0 <br />0.0 <br />0.0 <br />0.00 <br />on existing IOH -13H pad <br />K (Phase 1) <br />200.0 <br />150.0 <br />30,000.01 <br />0.69 <br />6.5 <br />L(Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />1 (Phase 1) <br />M (Phase 1) <br />200.0 <br />150.0 <br />30,000.0 <br />0.69 <br />6.5 <br />DS -7 (Phase 1) <br />0.0 <br />0.0 <br />0.01 <br />0.00 <br />on existing 2A -2V pad <br />TOTAL PHASE 1 WELL PAD DISTURBANCE (ac.) 8.26 <br />Well P&A Information <br />Well <br />Hole Depth <br />(ft.) <br />*brid a lu <br />Hole Dia <br />(�n') <br />Comment <br />81-1-1 <br />*2110 <br />6.969 <br />2012 <br />8H -R <br />*2110 <br />6.969 <br />91-1-1 <br />*2110 <br />6.969 <br />94 -1M <br />91-1-11 <br />*21101 <br />6.969 <br />1 2013 <br />14H-I <br />*21101 <br />6.969 <br />14H-RI <br />*21101 <br />6.969 <br />WSW -3 <br />1420 <br />6.969 <br />WSW-41 <br />14311 <br />6.969 <br />DS -6 (Phase 3)1 18821 4 <br />A (Phase 1) <br />1844 <br />6.5 <br />B (Phase 1) <br />1879 <br />6.5 <br />C (Phase 1) <br />1898 <br />6.5 <br />D (Phase 1) <br />1949 <br />6.5 <br />E (Phase 1) <br />1967 <br />6.5 <br />F(Phase 1) <br />1933 <br />6.5 <br />G (Phase 1)1 <br />2012 <br />6.5 <br />H (Phase 1) <br />1983 <br />6.5 <br />1 (Phase 1) <br />1986 <br />6.5 <br />1 (Phase 1) <br />2038 <br />6.5 <br />K (Phase 1) <br />1963 <br />6.5 <br />L(Phase 1) <br />1901 <br />6.5 <br />M (Phase 1) <br />1917 <br />6.5 <br />DS -7 (Phase 1)1 <br />4 <br />N (Phase 2) <br />1859 <br />6.5 <br />O (Phase 2) <br />1807 <br />6.5 <br />P (Phase 2) <br />1817 <br />6.5 <br />Q (Phase 2) <br />1836 <br />6.5 <br />R (Phase 2) <br />1835 <br />6.5 <br />S (Phase 2) <br />1744 <br />6.5 <br />T (Phase 2)1 <br />1739 <br />6.5 <br />U (Phase 2)1 <br />16941 <br />6.5 <br />Note the following wells, that are indicated on the 03/12/13 <br />CIRCES document, have been P &A'ed: <br />Well <br />Year of P&A <br />Comment <br />4A -1V <br />2012 <br />4A -5M <br />2012 <br />88 -1 <br />2013 <br />90 -2 <br />2013 <br />94 -1M <br />2012 <br />1 -3A <br />1 2013 <br />1 of 2 5: \Natural Soda Inc \MONITORING \NSI Reclamation & Disturbed Acreage\ <br />Daub & Associates, Inc. 0 NSI 2014 Drilling Program Proposed Pad & Road Construction Acerage 3 -18 -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.